NR NR/L2/OTK/5100/MOD02 ISSUE 1 PDF

NR NR/L2/OTK/5100/MOD02 ISSUE 1 PDF

Name:
NR NR/L2/OTK/5100/MOD02 ISSUE 1 PDF

Published Date:
03/03/2018

Status:
[ Revised ]

Description:

Boundary Management Manual: Boundary Measure Repair by Maintenance and Renewal

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-otk-5100-mod02-issue-1_2761828

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

Included in this module are:

a) the maintenance, repair and renewal requirements for boundary measures protecting Network Rail operational infrastructure, depots and adjacent railway facilities; and

b) the maintenance, repair and renewal requirements for boundary measures protecting Network Rail disused and closed lines, and other non-operational land.

Not included in this module are:

a) security measures that do not form part of the boundary;

b) maintenance, repair, renewal, and enhancement of retaining walls (see NR/L3/CIV/006/5a); and

c) vehicle containment systems (see NR/L3/CIV/00012).


Edition : 1
File Size : 1 file , 310 KB
Number of Pages : 11
Published : 03/03/2018

History

NR NR/L2/OTK/5100/MOD02 ISSUE 3
Published Date: 09/03/2022
Boundary Measure Management Manual: Boundary Measure Maintenance and Renewal
13.20 €
NR NR/L2/OTK/5100/MOD02 ISSUE 2
Published Date: 03/06/2021
Boundary Measure Management Manual: Boundary Measure Repair by Maintenance and Renewal
13.20 €
NR NR/L2/OTK/5100/MOD02 ISSUE 1
Published Date: 03/03/2018
Boundary Management Manual: Boundary Measure Repair by Maintenance and Renewal
13.20 €

Related products

NR NR/L2/ELP/27229 ISSUE 2
Published Date: 08/26/2008
Specification for Remote Control Equipment for Electrical Distribution Systems
35.40 €
NR BRS-SM 52330 ISSUE I
Published Date: 03/22/1996
Mechanical Supplementary Drive Mounted in 4' on Timber for UIC-54B Plain lead point layouts. For clamp lock or point M/C operated
5.70 €
NR TEF 3214 ISSUE 1
Published Date: 03/05/2011
Level Crossing Renewal/Refurbishment Risk Priority Assessment Form
5.70 €
NR NR/L3/OHS/005/05/F01 ISSUE 2
Published Date: 06/04/2022
Design and Construction Management in a High Street Environment: Car Park Away from Track, Does Not Service Station - Diagram
5.70 €

Best-Selling Products

Process Plant Commissioning : A User Guide
Published Date: 01/01/1990
25.15 €