Name:
NR NR/L2/OTK/5100/MOD02 ISSUE 3 PDF
Published Date:
09/03/2022
Status:
[ Active ]
Publisher:
Network Rail
This module applies to maintenance, repair and renewal requirements of boundary measures and all who are involved in those activities. This module covers:
a) the maintenance, repair and renewal requirements for boundary measures protecting Network Rail operational infrastructure, depots and adjacent railway facilities;
b) the maintenance, repair and renewal requirements for boundary measures protecting Network Rail disused and closed lines, and other non-operational land.
This module does not cover:
c) security measures that do not form part of the boundary;
d) maintenance, repair, renewal, and enhancement of retaining walls (see NR/L3/CIV/006 Structures, Tunnels and Operational Property Examinations);
e) vehicle containment systems (see NR/L3/CIV/00012 Road Vehicle Incursions: Risk Assessment of Public and Non-Public Bridge and Neighbouring Sites);
f) acoustic fences (barriers);
g) touch potential barriers;
h) safety barriers between two operational lines;
i) boundary measures forming part of a station or depot lease agreement; and
j) bridges, stations and level crossings.
A flow chart of the process within this module can be found in Appendix A.
| Edition : | 3 |
| File Size : | 1 file , 410 KB |
| Number of Pages : | 14 |
| Published : | 09/03/2022 |