NR NR/L2/OTK/5100/MOD03 ISSUE 1 PDF

NR NR/L2/OTK/5100/MOD03 ISSUE 1 PDF

Name:
NR NR/L2/OTK/5100/MOD03 ISSUE 1 PDF

Published Date:
03/06/2021

Status:
[ Revised ]

Description:

Boundary Measure Management Manual: Boundary Measure Specification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module covers the design, installation and performance of boundary measures and non-operational land barrier specifications to be installed on land owned by Network Rail (NR).

It applies to all boundary measure renewal activities, including like for like, upgrades or enhancements.

It applies to anyone who installs boundary measures for or on behalf of Network Rail.

NOTE: (examples include, Works Delivery, Capital Delivery, Maintenance Delivery Units and NR approved contractors)

Not included within this module are;

a) Existing/legacy boundary measures e.g. this standard is not retrospective

b) Acoustic fences e.g. these should (when installed) be standalone assets

c) Other structures on the boundary measure e.g. third-party buildings or structures

d) Barriers and fences that are not boundary measures e.g. fall protection measures, fencing around electrical rooms, etc.

e) Prevention of incursion by wild or exotic animals e.g. deer, ostrich, llama etc.

f) Other barriers that can be used as boundary measures that are not constructed e.g. ditches, watercourses and hedges

g) Retaining walls (Route Asset Manager or equivalent (RAM[OE]) structures specification)

h) Road vehicle incursion barriers


Edition : 1
File Size : 1 file , 460 KB
Number of Pages : 18
Published : 03/06/2021

History

NR NR/L2/OTK/5100/MOD03 ISSUE 2
Published Date: 09/03/2022
Boundary Measure Management Manual: Boundary Measure Specification
$13.2
NR NR/L2/OTK/5100/MOD03 ISSUE 1
Published Date: 03/06/2021
Boundary Measure Management Manual: Boundary Measure Specification
$13.2

Related products

NR NB 209 ISSUE 1
Published Date: 03/11/2022
SFI Temporary Arrangements
$5.7
NR NR/L3/CIV/140/078N ISSUE 2
Published Date: 03/06/2010
Model Clause 078N: Embedded Retaining Walls Constructed Using Bored Concrete Piles
$5.7
NR NB 098 ISSUE 1
Published Date: 09/01/2009
HW Series Point Machine Failures (Caused by Spirol Pin Issues)
$5.7
NR RT/SIN/072 ISSUE 1
Published Date: 12/01/2000
"Reed" Receiver Amplifiers
$7.5

Best-Selling Products

FORD AWX
Published Date: 12/01/1993
WIRE, TAMPICO, AND SYNTHETIC FILAMENT POWER WHEEL BRUSHES APPLICATIONS AND GENERAL INFORMATION
$9
FORD B2BBX
Published Date: 09/01/1991
ONE-STEP PAINT LINE CLEANING PROCEDURE
$9
FORD B2F1
Published Date: 02/01/1978
ANODIC ELECTROCOATING SYSTEM CLEANING AND MAINTENANCE
$9
FORD B2GX
Published Date: 04/01/1984
PAINT BAKE OVENS CLEANING AND MAINTENANCE
$9
FORD BAX-1
Published Date: 07/01/1977
PAINT SPRAYING SYSTEMS, SMALL PARTS, AUTOMATIC
$9
FORD BAX-2
Published Date: 07/01/1985
PAINT SPRAY BOOTH BACK SECTION ACCEPTANCE TEST
$9