NR NR/L2/RMVP/0200/P500 ISSUE 3 PDF

NR NR/L2/RMVP/0200/P500 ISSUE 3 PDF

Name:
NR NR/L2/RMVP/0200/P500 ISSUE 3 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Infrastructure Plant Manual: Competence and Fitness

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module defines the requirement:

a) for a competence management system to be implemented, in accordance with NR/L2/CTM/201; and

b) to manage the competence of persons undertaking safety critical work, in accordance with appropriate legislation.

It defines specific competence requirements for the control, operation and maintenance of plant. It specifies the use of a documented process to manage staff fitness.

This module applies to all organisations involved with the provision of staff for the control, operation or maintenance of plant used on Network Rail-managed infrastructure and Network Rail projects

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems;

b) operating error, operational error or equipment misuse;

c) multiple plant movements;

d) poor site or weather conditions;

e) incorrect lifting operations (LOLER);

f) lack of RIDDOR or close call reporting; and

g) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 3
File Size : 1 file , 340 KB
Number of Pages : 9
Published : 12/01/2018

History

NR NR/L2/RMVP/0200/P500 ISSUE 5
Published Date: 09/07/2024
Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations
$7.5
NR NR/L2/RMVP/0200/P500 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L2/RMVP/0200/P500 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Competence and Fitness
$7.5

Related products

NR NR/CIV/SD/4492 ISSUE 1
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Indicative Temporary Works Scheme for Lifting Roof Structures
$5.7
NR NR/GN/TRK/8001/0501 ISSUE 1
Published Date: 06/02/2018
Track Bowtie - Loss of Rail Profile Beyond Safe Operating Limits - Level 1
$5.7
NR NR/L3/INV/3001/RIM302 ISSUE 1
Published Date: 12/03/2011
Reporting & Investigation Manual: Management of Recommendations & Local Actions
$18.6
NR RT/E/WI/00020 ISSUE 1
Published Date: 02/01/2001
Signalling Maintenance Work Instruction Miscellaneous
$13.2

Best-Selling Products