NR NR/L2/RMVP/0200/P500 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P500 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P500 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Not for New Design ]

Description:

Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module defines specific competence requirements for the control, operation and maintenance of plant. It specifies the use of a documented process to manage staff competence and fitness.

This module applies to all organisations involved with the provision of staff for the control, operation or maintenance of plant used on Network Rail-managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) failure of plant or its control or safety systems

b) operating error, operational error or equipment misuse

c) multiple plant movements

d) poor site or weather conditions

e) incorrect lifting operations (LOLER)

f) lack of safety reporting

g) lack of continuous improvement, such as, mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 4
File Size : 2 files , 420 KB
Number of Pages : 8
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P500 ISSUE 5
Published Date: 09/07/2024
Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations
$7.5
NR NR/L2/RMVP/0200/P500 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L2/RMVP/0200/P500 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Competence and Fitness
$7.5

Related products

NR NR/L3/SIG/30011 ISSUE 1
Published Date: 06/01/2008
Signalling Equipment Support Specification
$18.6
NR NR/L3/OCS/044/FS-19A ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Fire System Statement
$5.7
NR NR/CIV/SD/F003/1300/ADD5 ISSUE A
Published Date: 03/07/2020
U-type Underbridges F003 Addendum
$35.4
NR BRS-SM 846/3
Published Date: 10/01/1989
Track Circuit Cables Termination of 50/0.25 Track Circuit Cable for Non-Rail End
$5.7

Best-Selling Products

NAGDM 105-1998
Published Date: 01/01/1998
American National Standard - Test Method for Thermal Transmittance and Air Infiltration of Garage Doors
$16.2
NAGDM 106-1988
Published Date: 01/01/1988
Proposed American National Standard - Official Color Codes for Torsion and Extension Springs
$16.2