NR NR/L2/RMVP/0200/P500 ISSUE 5 PDF

NR NR/L2/RMVP/0200/P500 ISSUE 5 PDF

Name:
NR NR/L2/RMVP/0200/P500 ISSUE 5 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module defines specific competence requirements for the control, operation and maintenance of plant. It specifies the use of a documented process to manage staff competence and fitness.

This module applies to all organisations involved with the provision of staff for the control, operation or maintenance of plant used on Network Rail Managed Infrastructure (NRMI) and Network Rail projects.

Purpose 

The implementation of this module contributes to mitigating the following risks: 

a) failure of plant or its control or safety systems; 

b) operating error, operational error or equipment misuse; 

c) multiple plant movements; 

d) poor site or weather conditions; 

e) incorrect lifting operations (i.e. operations which do not meet the requirements of the Lifting Operations and Lifting Equipment Regulations 1998 (LOLER)); 

f) lack of Reporting of Injuries, Diseases and Dangerous Occurrence Regulations (RIDDOR) or close call reporting; and 

g) lack of continuous improvement, such as mitigating factors from incidents not being introduced to machine/operating procedures.


Edition : 5
File Size : 1 file , 90 KB
Number of Pages : 9
Published : 09/07/2024

History

NR NR/L2/RMVP/0200/P500 ISSUE 5
Published Date: 09/07/2024
Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations
$7.5
NR NR/L2/RMVP/0200/P500 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Competence, Training and Fitness for Plant Operations - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L2/RMVP/0200/P500 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Competence and Fitness
$7.5

Related products

NR NR/L3/OCS/044/FS-07B ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Control of Work on Managed Stations - Application for Permission to Work
$5.7
NR NR/CIV/SD/4339 ISSUE A
Published Date: 03/07/2020
Ribbon Open Footbridge Series 4300: Deck Section
$5.7
NR RT/CE/S/019 ISSUE 1
Published Date: 04/01/1995
Cast Chairs, Baseplates & Blocks (aka NR/SP/TRK/019)
$13.2
NR X30250 ISSUE 2
Published Date: 08/02/2003
AOCL Typical Circuits Relay Configuration Details
$5.7

Best-Selling Products

BS CISPR 12:1997
Published Date: 04/15/1999
Vehicles, motorboats and spark-ignited engine-driven devices. Radio disturbance characteristics. Limits and methods of measurement
$105.156
BS CISPR 16-1:1998
Published Date: 12/15/1998
Specification for radio disturbance and immunity measuring apparatus and methods-Radio disturbance and immunity measuring apparatus
$119.634
BS CISPR 16-1:1999
Published Date: 10/08/2003
Specification for radio disturbance and immunity measuring apparatus and methods-Radio disturbance and immunity measuring apparatus
$119.634
BS CISPR 16-2:1996
Published Date: 03/26/2003
Specification for radio disturbance and immunity measuring apparatus and methods-Methods of measurement of disturbances and immunity
$119.634
BS CISPR 16-3:2000
Published Date: 09/15/2000
Specification for radio disturbance and immunity measuring apparatus and methods-Reports and recommendations of CISPR
$119.634
CISPR 10 Amd.1 Ed. 4.0 b:1995
Published Date: 04/28/1995
Amendment 1 - Organization, rules and procedures of the CISPR
$7.5