NR NR/L2/RMVP/0200/P501 ISSUE 4 PDF

NR NR/L2/RMVP/0200/P501 ISSUE 4 PDF

Name:
NR NR/L2/RMVP/0200/P501 ISSUE 4 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Infrastructure Plant Manual: Systems of Work

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module defines the requirements for controlling risks when working with plant in particular situations, for example, on gradients and cants, in electrification areas or poor track conditions.

This module applies to all organisations involved with the planning or supply of plant, or carrying out/controlling plant operations on Network Rail-managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) compliance with legislation (LOLER, PUWER, HASAW, ROGS, MHSWR);

b) runaway/failure to stop on demand, e.g. OTP running away on a gradient;

c) MEWPs becoming out of control, e.g. MEWP operator being crushed under a structure;

d) collision, e.g. collision between a RRV and an OTM;

e) overturning, e.g. RRV overturning during lifting operations;

f) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation;

g) contact with energised Over Head Line Equipment (OLE);

h) points run through; and

i) derailment, e.g. trailer being loaded incorrectly; and staff injuries.


Edition : 4
File Size : 1 file , 580 KB
Number of Pages : 19
Published : 12/01/2018

History

NR NR/L2/RMVP/0200/P501 ISSUE 5
Published Date: 06/04/2022
Infrastructure Plant Manual: Systems of Work
$13.2
NR NR/L2/RMVP/0200/P501 ISSUE 4
Published Date: 12/01/2018
Infrastructure Plant Manual: Systems of Work
$13.2

Related products

NR NR/L3/ENV/305 ISSUE 3
Published Date: 09/04/2021
How to Change Utility Supplies
$18.6
NR NR/CIV/SD/464 ISSUE A
Published Date: 04/01/2008
Footbridge Access Trestle Main Span Landing Option 2 with Future Ramp
$5.7
NR T60213 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits TPWS - TSS & OSS Function Normal Direction (Down). Direction of Travel - Up Acc: Relay Interface Location Case Circuit
$5.7
NR NR/L3/SIG/11303/2X30 ISSUE 1
Published Date: 03/02/2019
Signalling Installation: Level Crossings: Installation of Newgate Level Crossing Barrier Protection Caging
$18.6

Best-Selling Products

NZS 10011
Published Date:
Guidelines for auditing quality systems
NZS 1011:1964
Published Date:
Methods for bend testing of metals
NZS 1153
Published Date:
Specification for screw gauge limits and tolerances
NZS 1188:1954
Published Date:
Fire-doors and fire-windows
NZS 1227
Published Date:
Specification for Unified screw threads
NZS 1340:1970
Published Date:
Thermal insulating materials for buildings