NR NR/L2/RMVP/0200/P501 ISSUE 5 PDF

NR NR/L2/RMVP/0200/P501 ISSUE 5 PDF

Name:
NR NR/L2/RMVP/0200/P501 ISSUE 5 PDF

Published Date:
06/04/2022

Status:
[ Active ]

Description:

Infrastructure Plant Manual: Systems of Work

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module defines the requirements for controlling risks when working with plant in particular situations, for example, on gradients and cants, in electrification areas or poor track conditions.

This module applies to all organisations involved with the planning or supply of plant or carrying out/controlling plant operations on Network Rail-managed infrastructure and Network Rail projects.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) compliance with legislation

b) runaway/failure to stop on demand, e.g. OTP running away on a gradient

c) MEWPs becoming out of control, e.g. MEWP operator being crushed under a structure

d) collision, e.g. collision between a RRV and an OTM

e) overturning, e.g. RRV overturning during lifting operations

f) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation

g) contact with energised Overhead Line Equipment (energised and deenergised)energised

h) points run through; and

i) derailment, e.g. trailer being loaded incorrectly and staff injuries.


Edition : 5
File Size : 1 file , 390 KB
Number of Pages : 18
Published : 06/04/2022

History

NR NR/L2/RMVP/0200/P501 ISSUE 5
Published Date: 06/04/2022
Infrastructure Plant Manual: Systems of Work
$13.2
NR NR/L2/RMVP/0200/P501 ISSUE 4
Published Date: 12/01/2018
Infrastructure Plant Manual: Systems of Work
$13.2

Related products

NR NR/CIV/SD/2148-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Setting Out Details - Square Span
$5.7
NR NR/GN/SIG/50015 ISSUE 3
Published Date: 09/05/2020
Methodology for the Demonstration of Electrical Compatibility with Reed FDM Systems on the AC and DC Railways
$18.6
NR NR/L2/RMVP/0200/P024 ISSUE 2
Published Date: 09/03/2011
Use and Loading of Mobile Elevating Work Platforms (MEWPs)
$7.5
NR NR/CIV/SD/1043 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Shallow Narrow Floors: 0-20 Degrees Skew
$5.7

Best-Selling Products