NR NR/L2/RMVP/0200/P513 ISSUE 3 PDF

NR NR/L2/RMVP/0200/P513 ISSUE 3 PDF

Name:
NR NR/L2/RMVP/0200/P513 ISSUE 3 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Infrastructure Plant Manual: Mobile Plant (Non-Rail Mounted) and Road Vehicles

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module specifies requirements and guidance for using mobile plant:

a) on or near the line;

b) lineside; and

c) when transporting plant.

This module applies to organisations involved with the planning or supply of any mobile plant, carrying out or controlling operations using mobile plant, or maintaining mobile plant used on Network Rail managed infrastructure and Network Rail projects. Mobile plant is any item of plant not classed as OTP or OTM

Purpose

The implementation of this module contributes to mitigating the following risks:

a) compliance with legislation (LOLER, PUWER, HASAW);

b) MEWPs becoming out of control, e.g. MEWP operator being crushed under a structure;

c) collision, e.g. collision between a RRV and an OTM;

d) overturning, e.g. RRV overturning during lifting operations;

e) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation; and

f) staff injuries, e.g. Operator


Edition : 3
File Size : 1 file , 330 KB
Number of Pages : 11
Published : 12/01/2018

History

NR NR/L2/RMVP/0200/P513 ISSUE 4
Published Date: 06/04/2022
Infrastructure Plant Manual: Mobile Plant (Non-Rail Mounted) and Road Vehicles
$7.5
NR NR/L2/RMVP/0200/P513 ISSUE 3
Published Date: 12/01/2018
Infrastructure Plant Manual: Mobile Plant (Non-Rail Mounted) and Road Vehicles
$13.2

Related products

NR NR/L2/MTC/10662 ISSUE 13
Published Date: 03/04/2023
Process for the Creation of New or Revised Maintenance Regimes Using Reliability Centred Maintenance (RCM)
$13.2
NR NR/L3/ELP/29987/MOD06 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR BRS-SM 60/5-6 ISSUE A
Published Date: 12/12/1977
Colour Light Signals Rear Guard Rail Offset Hoop for Wide Top Staging
$5.7
NR BRS-SE 164/1 ISSUE B
Published Date: 09/24/1980
Position Light Signals Comparison of Existing Signals with BR Standard Requirements
$5.7

Best-Selling Products

NAR CDG
Published Date:
Contest Directors Guide
$2.7
NAR CMASSPB
Published Date:
CMASS Plan Book
$3.6
NAR ED-12
Published Date:
Lower Tropospheric Probe
$1.2
NAR ED-20
Published Date:
Model Rocket Classroom Activities
$3
NAR ED-25
Published Date:
Rocketry Electrical Projects
$1.8
NAR GCCC
Published Date:
Guide to Competition for the Casual Competitor
$2.4