Name:
NR NR/L2/RSE/100/04 ISSUE 2 PDF
Published Date:
12/05/2015
Status:
[ Revised ]
Publisher:
Network Rail
This module specifies the process to introduce a new or modified rail vehicle onto Network Rail infrastructure.
It applies when Network Rail is the affected party or proposer.
It does not apply to vehicles operating in a possession or testing on the mainline railway but does include transit to and from a possession or test zone.
Purpose
This module supports GE/RT8270 Assessment of Compatibility of Rolling Stock and Infrastructure. It sets out the processes to be followed by a proposer to achieve the requirements of the standard.
This module is part of a suite of processes governed by Network Rail Assurance Panel (NRAP) to reduce the risk of projects, products or vehicles being brought into service.
The other modules in the suite are:
NR/L2/RSE/100/01 Network Rail Assurance Panel
NR/L2/RSE/100/02 Application of the Common Safety Method for Risk Evaluation and Assessment
NR/L2/RSE/100/03 The application of interoperability regulations for infrastructure projects
NR/L2/RSE/100/05 Product introduction and change to Network Rail operational infrastructure
NR/L2/RSE/100/06 How to decide what needs product acceptance via NR/L2/RSE/100/05
NR/L2/RSE/100/07 System Review Panels
NOTE Information on roles and responsibilities, and definitions used in this module can be found in NR/L2/RSE/100/01.
| Edition : | 2 |
| File Size : | 3 files , 1.8 MB |
| Number of Pages : | 8 |
| Published : | 12/05/2015 |