NR NR/L2/RSE/100 ISSUE 5 PDF

NR NR/L2/RSE/100 ISSUE 5 PDF

Name:
NR NR/L2/RSE/100 ISSUE 5 PDF

Published Date:
06/01/2019

Status:
[ Revised ]

Description:

Network Rail Assurance Panel Processes

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies NRAP’s accountabilities and the processes it follows in order to fulfil them. 
It applies to anyone making an application: 
a) to introduce new or changed vehicles on Network Rail Infrastructure, or change where they operate (as defined by the authorised routes); or 
b) that could affect the compatibility between vehicles and Network Rail infrastructure; or 
c) that is a change to Network Rail infrastructure; or the way it is operated 

NOTE:  The scope of NRAP does not normally include maintenance of equipment, or equipment replaced due to failure. This applies if approved equipment in pre-existing applications is used, that no designs are produced and the configuration of NR infrastructure is unchanged. 
d) to introduce new or changed products as part of Network Rail Infrastructure. 
This applies even if the application will not be controlled or carried out by Network Rail. 
The risk management process under CSM-RA as defined in this module can be used by the principal designer to discharge their duties under the CDM Regulations 2015. 
The application of the CSM-RA Regulation to organisational change is not within scope, this is covered by NR/L2/HSS/020 Safety Validation of Organisational Change.

Purpose

Network Rail Assurance Panel (NRAP) governs a number of Network Rail processes on behalf of Network Rail’s Executive. 
These processes help Network Rail comply with its statutory responsibilities and Health and Safety Management System when a change is introduced that could change the risk profile of Network Rail Infrastructure. 
This standard sets out how NRAP carries out these responsibilities and delegates authority to bodies and individuals within Network Rail. 
The standard helps applicants to identify the correct process for their proposal. 
NRAP governs a number of processes that provide appropriate review prior to projects, products and vehicles being brought into service.


Edition : 5
File Size : 1 file , 570 KB
Number of Pages : 11
Published : 06/01/2019

History

NR NR/L2/RSE/100 ISSUE 8
Published Date: 06/01/2024
Network Rail Assurance Panel Processes
$13.2
NR NR/L2/RSE/100 ISSUE 7
Published Date: 12/04/2021
Network Rail Assurance Panel Processes
$13.2
NR NR/L2/RSE/100 ISSUE 6
Published Date: 09/04/2021
Network Rail Assurance Panel Processes
$13.2
NR NR/L2/RSE/100 ISSUE 5
Published Date: 06/01/2019
Network Rail Assurance Panel Processes
$13.2

Related products

NR RT/E/PS/11763 ISSUE 1
Published Date: 12/01/2000
Reed Type RT Track Circuits (aka NR/PS/SIG/11763)
$24.3
NR RT/E/WI/00109 ISSUE E1
Published Date: 02/01/2004
Machine Switch Out in Conjunction with the Trial of on Track Maintenance Machines (aka NR/WI/ELP/00109)
$13.2
NR X42320 ISSUE 2
Published Date: 09/05/2009
Wicket Gate Typical Circuits Magnetic Lock Crossing Operators Indication Unit Wiring and FacePlate Detail
$5.7
NR RT/E/C/19042 ISSUE 1
Published Date: 02/01/2001
Signalling Equipment Technical Advice Notice (SIGTAN042) - Control Equipment Integrated Electronic Control Centre (aka NR/GN/SIG/19042)
$13.2

Best-Selling Products

11621 18
Published Date: 01/13/2011
Implications of Web-Based, Collaborative Technologies in Records Management