NR NR/L2/SIG/11774/SR0001TA ISSUE 1 PDF

NR NR/L2/SIG/11774/SR0001TA ISSUE 1 PDF

Name:
NR NR/L2/SIG/11774/SR0001TA ISSUE 1 PDF

Published Date:
06/02/2012

Status:
[ Active ]

Description:

Clamp Lock Fault Finding (aka NR/L2/SIG/11774/A115)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

This Part is a brief description of the procedure to be adopted when attending a Clamplock failure. It does not include drive circuits or line circuits, which are common to most power operated points. It is presumed that the point drive circuits and the hydraulic power pack are functioning correctly. To check the power pack, observe the hydraulic hoses for flexing and relaxing during attempted power operation. A single ended set of points will be considered. (For double ended points, check both ends.) The following is by no means a complete list of all failures. It is designed to aid true fault location in order to prevent other adjustments or actions being used to overcome the failure.

Testing

Always obtain the signallers permission before any tests are carried out.

Note:

The disconnection's shown in NR?SMS/PB11 are for single ended sets. If facing point lock or detection tests are to be carried out on multiple ends ALL ends shall be isolated at the applicable pump units before work commences. Correct correspondence of ALL ends SHALL be maintained throughout the tests. This allows all testing to be carried out with reference to the voltage of the circuit under test and prevents the unintentional movement of any other ends.

Manually prove any adjustments are correct by hand pump operation before restoring to power operation by turning the switch on the Hydraulic Power Unit to the 'POWER' position. Finally test by operation from the signal box and observe that the apparatus functions correctly.


Edition : 1
File Size : 1 file , 670 KB
Number of Pages : 13
Published : 06/02/2012

History


Related products

NR NR/L3/SCO/311/17 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Asset Configuration Management
$7.5
NR BRS-SM 52485
Published Date: 09/07/1995
Switch Diamond, Point Machine OP Parts Schedule for Drive Rod Assembly 113A Stock, UIC-54B Switch Rail
$5.7
NR NR/L3/MTC/TK0074 ISSUE 1
Published Date: 12/01/2007
Management of Hot Weather Precautions (Track)
$13.2
NR NR/L2/ELP/27023/MOD B ISSUE 2
Published Date: 03/02/2024
Conductor Rail Heating: Design and Installation Requirement for Conductor Rail Heating
$18.6

Best-Selling Products

DANSK DS 1051.2
Published Date: 01/01/1980
Brandprøvning. Modstandsevne mod brand. Døre
$12.6
DANSK DS 1052.1
Published Date: 01/01/1985
Brandteknisk klassifikation. Bygningsdele eksklusive døre. Modstandsevne mod brand
$6.9
DANSK DS 1052.2
Published Date: 01/01/1985
Brandteknisk klassifikation. Døre. Modstandsevne mod brand
$6.9
DANSK DS 1052
Published Date: 01/21/2021
Brandteknisk klassifikation af bygningsdele (ekskl. døre)
$6.9
DANSK DS 1107
Published Date: 01/01/1978
Trapper. Terminologi
$6.9
DANSK DS 1140
Published Date: 08/20/2019
Udførelse af bærende konstruktioner – Almen kontrol
$24.9