NR NR/L2/SIG/30009/A200 ISSUE 1 PDF

NR NR/L2/SIG/30009/A200 ISSUE 1 PDF

Name:
NR NR/L2/SIG/30009/A200 ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Revised ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Legacy Arrangements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The content of this module is pertinent to the implementation of signalling logic to fulfil the requirement to implement the required functional requirements, whether that is to be achieved in the interlocking itself, or at the trackside, or within the signaller’s control system or other related system.

This module applies to all command and control equipments (see the typical listing in NR/L2/SIG/30009/A060 Section Error! Reference source not found.) for new provision and, subject to consideration of "using reasonable opportunity" and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme.

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

Purpose

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook. Its purpose is to record the legacy practices which exist within the signalling asset but which are generally no longer considered as being the first choice approach for new applications. Their use in alterations may remain applicable. (Refer to each individual entry).


Edition : 1
File Size : 1 file , 290 KB
Number of Pages : 15
Published : 12/05/2020

History

NR NR/L2/SIG/30009/A200 ISSUE 3
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
$18.6
NR NR/L2/SIG/30009/A200 ISSUE 2
Published Date: 09/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
$13.2
NR NR/L2/SIG/30009/A200 ISSUE 1
Published Date: 12/05/2020
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Legacy Arrangements
$13.2

Related products

NR NR/CIV/SD/4530 ISSUE 2
Published Date: 03/05/2021
Frame Open Footbridge Series 4500: Main Elevation - Stair Side
$5.7
NR NR/SIN/206 ISSUE 2
Published Date: 01/12/2022
Managing Wheel Strike Risk at Cast Obtuse Crossings
$18.6
NR NR/L3/TRK/2049/MOD07 ISSUE 2
Published Date: 06/03/2017
Track Design Handbook: Gauging
$7.5
NR E10016/15 ISSUE 3
Published Date: 09/01/2004
Typical Circuits Former Western Region Point Machines Electrical Detection Standard WR Applications (including Clamp Locks)
$5.7

Best-Selling Products

AVIXA A102.01
Published Date: 04/11/2017
Audio Coverage Uniformity in Listener Areas
$22.5
AVIXA ANSI/INFOCOMM 10
Published Date: 12/20/2013
Audiovisual Systems Performance Verification
$22.5
AVIXA ANSI/INFOCOMM 2M
Published Date: 12/05/2010
Standard Guide for Audiovisual Systems Design and Coordination Processes
$22.5
AVIXA ANSI/INFOCOMM 3M
Published Date: 06/30/2011
Projected Image System Contrast Ratio
$22.5
AVIXA ANSI/INFOCOMM 4
Published Date: 06/19/2012
Audiovisual Systems Energy Management
$22.5
AVIXA F501.01
Published Date: 12/31/2015
Cable Labeling for Audiovisual Systems
$22.5