NR NR/L2/SIG/30009/A200 ISSUE 2 PDF

NR NR/L2/SIG/30009/A200 ISSUE 2 PDF

Name:
NR NR/L2/SIG/30009/A200 ISSUE 2 PDF

Published Date:
09/04/2021

Status:
[ Revised ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

The content of this module is pertinent to the implementation of signalling logic to fulfil the requirement to implement the required functional requirements, whether that is to be achieved in the interlocking itself, or at the trackside, or within the signaller’s control system or other related system.

This module applies to all command and control equipments (see the typical listing in NR/L2/SIG/30009/A060 Section C1.2) for new provision and, subject to consideration of "using reasonable opportunity" and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme.

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.  

Purpose 

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook. Its purpose is to record the legacy practices which exist within the signalling asset but which are generally no longer considered as being the first choice approach for new applications. Their use in alterations may remain applicable. (Refer to each individual entry). 


Edition : 2
File Size : 1 file , 310 KB
Number of Pages : 18
Published : 09/04/2021

History

NR NR/L2/SIG/30009/A200 ISSUE 3
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
$18.6
NR NR/L2/SIG/30009/A200 ISSUE 2
Published Date: 09/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms; Legacy Arrangements
$13.2
NR NR/L2/SIG/30009/A200 ISSUE 1
Published Date: 12/05/2020
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Legacy Arrangements
$13.2

Related products

NR NR/CIV/SD/230 ISSUE E
Published Date: 09/02/2017
Embankment Regrading: Slope Regrade
$5.7
NR NR/CIV/SD/1532 ISSUE C
Published Date: 12/03/2016
E-Type Underbridges: Cross Girder & Trimmer: Double Track Square Filler Beam Floor Trimmer
$5.7
NR BRS-SM 3290 ISSUE A
Published Date: 04/10/2015
IBCL Operated Point Layout with Tubular Stretcher Bars - NR56 GVS switches - Mechanical Supplementary Drive Mounted External to 4 Foot
$5.7
NR NR/L3/TRK/1020 ISSUE 1
Published Date: 12/03/2022
Track Hand Back for Projects: Confirming Track Is Safe for Opening at the Selected Line Speed After Projects Engineering Work
$18.6

Best-Selling Products

CE Marking Handbook
Published Date: 09/01/1998
Knowledge in Organizations
Published Date: 01/01/1997
Knowledge Management Tools
Published Date: 12/01/1996
Turnaround Management
Published Date: 07/01/1999