NR NR/L2/SIG/30014/C210 ISSUE 3 PDF

NR NR/L2/SIG/30014/C210 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30014/C210 ISSUE 3 PDF

Published Date:
12/07/2019

Status:
[ Revised ]

Description:

Signalling Works Testing Handbook: Signal Works Acceptance of Testing Planning Documentation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document applies to work that meets the selection criteria for NR/L2/SIG/30014/A110 or NR/L2/SIG/30014/A210 as defined in NR/L2/SIG/30014/A100 .

Purpose

This document is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014 , which together detail the requirements for signalling works testing activities.

This document specifies requirements for the acceptance of testing planning documentation by Network Rail before signalling works testing on Network Rail signalling infrastructure can proceed.


Edition : 3
File Size : 1 file , 340 KB
Number of Pages : 15
Published : 12/07/2019

History

NR NR/L2/SIG/30014/C210 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation
$13.2
NR NR/L2/SIG/30014/C210 ISSUE 4
Published Date: 06/04/2022
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/SIG/30014/C210 ISSUE 3
Published Date: 12/07/2019
Signalling Works Testing Handbook: Signal Works Acceptance of Testing Planning Documentation
$13.2

Related products

NR R28130 ISSUE 1
Published Date: 09/11/1997
Route Relay Interlocking Typical Circuits Signals & Indicators Position Light Shunting Signal Controls & Proving Through Circuits
$5.7
NR NR/CIV/SD/716 ISSUE E
Published Date: 06/18/2015
Non-Canopy Station Footbridges: Ramp - CHS Support - Indicative Drainage Route
$5.7
NR NR/CIV/SD/FORMB/260 ISSUE P4
Published Date: 03/03/2012
Form B: Cess Support
$7.5
NR TWI 2G057 ISSUE 1
Published Date: 03/01/2005
How to Use Track Circuit Operating Clips
$5.7

Best-Selling Products