NR NR/L2/SIG/30014/C210 ISSUE 4 PDF

NR NR/L2/SIG/30014/C210 ISSUE 4 PDF

Name:
NR NR/L2/SIG/30014/C210 ISSUE 4 PDF

Published Date:
06/04/2022

Status:
[ Not for New Design ]

Description:

Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This Module applies to all Projects to alter, or with the potential to affect the fitness for purpose of, Network Rail’s infrastructure that meet the selection criteria defined in NR/L3/SIG/10064 NR/GI/T001 (Testing – General) for testing to NR/L2/SIG/30014.

The inclusions and exclusions documented in NR/L2/SIG/30014/A110 also apply to the scope of this Module.

Purpose

This Module is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities.

This Module specifies requirements for the acceptance of testing planning documentation by Network Rail before signalling works testing on Network Rail signalling infrastructure can proceed. 


Edition : 4
File Size : 2 files , 590 KB
Number of Pages : 18
Published : 06/04/2022

History

NR NR/L2/SIG/30014/C210 ISSUE 5
Published Date: 09/07/2024
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation
$13.2
NR NR/L2/SIG/30014/C210 ISSUE 4
Published Date: 06/04/2022
Signalling Works Testing: Signal Works Acceptance of Testing Planning Documentation - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/SIG/30014/C210 ISSUE 3
Published Date: 12/07/2019
Signalling Works Testing Handbook: Signal Works Acceptance of Testing Planning Documentation
$13.2

Related products

NR NR/CIV/SD/1018 ISSUE C
Published Date: 09/02/2017
Box Girder Underbridge Main Girders - End Diaphragm Access Doors and Louvre Details
$5.7
NR NR/L3/ELP/21067 ISSUE 8
Published Date: 09/07/2024
Instructions for Making Out, Issuing and Cancelling High Voltage Permits to Work, Sanctions for Test & Circuit State Certificates
$24.3
NR NR/L3/MTC/RCS0216/DP01 ISSUE 4
Published Date: 03/07/2020
Risk Control Manual: Working on or Near High Voltage Non-Traction Distribution Equipment
$13.2
NR T25350 ISSUE 3
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points - Point Machine Operated Double Slips with Spec BR998 Detector
$5.7

Best-Selling Products