Name:
NR NR/L2/TEL/30022 ISSUE 7 PDF
Published Date:
06/04/2011
Status:
[ Revised ]
Publisher:
Network Rail
This procedure applies to:
a) the communications engineering content of all schemes proposed to be implemented by, or on behalf of, any Network Rail Directorate including feasibility studies and other preliminary designs
b) proposals for temporary works associated with such schemes
These procedures do not apply to:
a) normal day to day maintenance work
b) work carried out under emergency conditions
c) assessments of existing installations and equipment
Purpose
To define procedures for the technical acceptance requirements for changes to the infrastructure to telecommunications schemes and services.
| Edition : | 7 |
| File Size : | 1 file , 200 KB |
| Number of Pages : | 13 |
| Published : | 06/04/2011 |