NR NR/L2/TRK/0032 ISSUE 7 PDF

NR NR/L2/TRK/0032 ISSUE 7 PDF

Name:
NR NR/L2/TRK/0032 ISSUE 7 PDF

Published Date:
03/03/2018

Status:
[ Active ]

Description:

Joining of Rails by Aluminothermic Welding

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-trk-0032-issue-7_2766938

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

This specification applies to all aluminothermic welding that may be carried out on, or for casting into, Network Rail managed infrastructure.

This specification identifies the prerequisites for process suppliers and recognises the process supplier as the leading exponent of that process in terms of training, certification and re-certification.

Network Rail’s requirements are contained in this specification with a list of approved process suppliers.

The inspection of welds is included in this specification, together with time-based remedial actions.

Purpose

This specification defines the standards to be achieved when aluminothermic welding is carried out, whether in or out of the track, and defines the welding procedures to be used. By adhering to the specifications and standards within this document, the risk of weld failure/break is reduced. The quality of the weld cast is improved and kept within the process supplier’s parameters. The safety of the traveling public and staff undertaking aluminothermic welding activities is maintained to the highest levels.


Edition : 7
File Size : 1 file , 800 KB
Number of Pages : 43
Published : 03/03/2018

History

NR NR/L2/TRK/0032 ISSUE 7
Published Date: 03/03/2018
Joining of Rails by Aluminothermic Welding
18.60 €
NR NR/L2/TRK/0032 ISSUE 6
Published Date: 06/03/2017
Joining of Rails by Aluminothermic Welding
18.60 €
NR NR/L2/TRK/0032 ISSUE 5
Published Date: 12/04/2010
Joining of Rails by Aluminothermic Welding
18.60 €

Related products

NR NR/L2/SIG/14201/MOD04 ISSUE 3
Published Date: 12/05/2020
Signalling Risk Assessment Handbook: Prevention and Mitigation of Overruns - Signal Overrun Risk Assessment Tool Specification
18.60 €
NR NR/L3/SIG/11303/2A10 ISSUE 2
Published Date: 09/04/2010
Signalling Installation Cabling: Jointing and Termination
13.20 €
NR NR/L3/INI/PG115/PS/005 ISSUE 2
Published Date: 06/05/2010
Planning & Programme Controls: Guidance on Network Rail Oracle Projects and Primavera Interface (Formerly NR/ GN/INI/PG115/P/005)
13.20 €
NR NR/L2/SIG/30038 ISSUE 1
Published Date: 06/04/2016
Supplementary Audible Warning Devices (AWDs) at Footpath and Bridleway Level Crossings Protected by a Whistle Board
13.20 €

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
0.30 €
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
62.10 €
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
62.10 €
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
123.90 €
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
62.10 €