NR NR/L2/TRK/0032 ISSUE 6 PDF

NR NR/L2/TRK/0032 ISSUE 6 PDF

Name:
NR NR/L2/TRK/0032 ISSUE 6 PDF

Published Date:
06/03/2017

Status:
[ Revised ]

Description:

Joining of Rails by Aluminothermic Welding

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This specification applies to all aluminothermic welding that may be carried out on, or for casting into, Network Rail managed infrastructure.

This specification identifies the prerequisites for process suppliers and recognises the process supplier as the leading exponent of that process in terms of training, certification and re-certification.

Network Rail’s requirements are contained in this specification with a list of approved process suppliers.

The inspection of welds is included in this specification, together with time-based remedial actions.

PURPOSE

This specification defines the standards to be achieved when aluminothermic welding is carried out, whether in or out of the track, and defines the welding procedures to be used. By adhering to the specifications and standards within this document, the risk of weld failure/break is reduced. The quality of the weld cast is improved and kept within the process supplier’s parameters. The safety of the traveling public and staff undertaking aluminothermic welding activities is maintained to the highest levels.


Edition : 6
File Size : 1 file , 910 KB
Number of Pages : 46
Published : 06/03/2017

History

NR NR/L2/TRK/0032 ISSUE 7
Published Date: 03/03/2018
Joining of Rails by Aluminothermic Welding
$18.6
NR NR/L2/TRK/0032 ISSUE 6
Published Date: 06/03/2017
Joining of Rails by Aluminothermic Welding
$18.6
NR NR/L2/TRK/0032 ISSUE 5
Published Date: 12/04/2010
Joining of Rails by Aluminothermic Welding
$18.6

Related products

NR X22065 ISSUE 2
Published Date: 08/07/2004
ABCL TYPICAL CIRCUITS DOUBLE LINE BI-DIRECTIONAL CONTROL CIRCUITS (2)
$5.7
NR NR/L3/ELP/27240/NR/DIST C22I ISSUE 1
Published Date: 06/03/2023
Routine Maintenance of Weatherproof Metal Enclosed Lucy SF6 12kV 20kA, 630A/250A Sabre VRN2a Ring Main Unit
$5.7
NR NR/L3/OPS/045/3.22 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.22: Response to Remote Condition Monitoring Alarms
$5.7
NR RT/E/WI/27076 ISSUE 1
Published Date: 12/04/2004
Instructions for Maintenance of All Voltage Regulators & Regulating Transformers
$13.2

Best-Selling Products