NR NR/L2/TRK/3203 ISSUE 1 PDF

NR NR/L2/TRK/3203 ISSUE 1 PDF

Name:
NR NR/L2/TRK/3203 ISSUE 1 PDF

Published Date:
09/03/2011

Status:
[ Withdrawn ]

Description:

Structure Gauge Recording

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

Asset Information is responsible and accountable for undertaking work in compliance with this standard.

This Network Rail standard specifies the minimum requirements for the data within Network Rail's National Gauging Database (NGD). It specifies:

a) the information contained in both the NGD and the Tight Clearance Database (TiCleD);

b) structure gauging survey requirements and frequencies;

c) requirements for the equipment used to measure structure clearances;

d) tolerances and acceptability of structure gauging survey data;

e) calibration of equipment used in measuring clearances.

It applies to the following equipment:

a) Train-mounted Gauging Survey Equipment;

b) Self-propelled rail vehicle Gauging Survey Equipment;

c) Manual Gauging Survey Equipment.

This standard applies to all running lines and sidings maintained by Network Rail.

NOTE Particular requirements at leased depots are specified in RT/CE/S/037.

Purpose

NR/L2/TRK/3203 is a system specification that gives the minimum requirements for Gauging Surveying and the data within Network Rail's National Gauging Database (NGD). This Standard specifies detail of Network Rail compliance with GC/RT5212 Sections E and K. NR/L2/TRK/3203 is part of the suite of gauging standards which manage risk relating to gauging compatibility, structural clearances, passing clearances and calculation of stepping clearances.


Edition : 1
File Size : 1 file , 520 KB
Number of Pages : 46
Published : 09/03/2011

History


Related products

NR X70040 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits Barrier Control Circuits (2)
$5.7
NR NR/L2/ELP/27009/MOD C53 ISSUE 1
Published Date: 12/03/2011
Revised Return Conductor Support Design at Booster Transformer Connection Locations
$5.7
NR NR/L2/ELP/21087 ISSUE 11
Published Date: 12/02/2023
Specification of Maintenance Frequency and Defect Prioritisation of Overhead Line Electrification Equipment
$24.3
NR BRS-SE 5170
Published Date:
Position Light Signals Lens Conversion Kits WB&S Co 'Westlyte' Signals E4820 & E4820-1
$5.7

Best-Selling Products

API 062 (DP)
Published Date: 10/01/1990
An Historical Overview of Solid Waste Management in the Petroleum Industry
$4.5
API 083 (RS)
Published Date: 08/01/1996
Octane Requirements of the Motor Vehicle Fleet and Gasoline Grade Sales
$4.5
API 10A Addendum 1
Published Date: 04/01/2000
Addendum 1 - Specification for Cements and Materials for Well Cementing
Free Download
API 10A Addendum 2
Published Date: 12/01/2000
Addendum 2 - Specification for Cements and Materials for Well Cementing - Also Incorporates Addendum 1
$4.2
API 10B Addendum 1
Published Date: 10/01/1999
Addendum 1 - Recommended Practice for Testing Well Cements
Free Download
API 10B Addendum 2
Published Date: 11/01/2000
Addendum 2 - Recommended Practice for Testing Well Cements
Free Download