NR RT/LS/P/032 ISSUE 3 PDF

NR RT/LS/P/032 ISSUE 3 PDF

Name:
NR RT/LS/P/032 ISSUE 3 PDF

Published Date:
06/01/2005

Status:
[ Inactive ]

Description:

Line Managers Self-Assurance (aka NR/SP/ASR/032)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

This Procedure is mandatory to all of Network Rail and is applicable to all activities. The Line Managers Self-Assurance process concentrates on Network Rail's Railway Safety Case and Safety Management System.

The application of this process does not remove the requirement to carry out other checks, inspection, monitoring, audit and/or certification, etc. as required by Legislation or Professional/Technical/Railway Group or Network Rail Company Standards and Specifications, Procedures or Work Instructions etc.

Purpose

Line Manager's Self-Assurance provides one of the mechanisms for assurance, requiring Line Managers in specified parts of the organisation to annually verify compliance with specific requirements of the Network Rail Railway Safety Case.

It is through this process that Business Units will be able to routinely determine which aspects of the Safety Management System are being complied with working well and which require attention. This understanding will enable local and HQ Management reviews to direct resources appropriately in resolution of these issues


Edition : 3
File Size : 1 file , 190 KB
Number of Pages : 12
Published : 06/01/2005

History

NR RT/LS/P/032 ISSUE 3
Published Date: 06/01/2005
Line Managers Self-Assurance (aka NR/SP/ASR/032)
$13.2
NR RT/LS/P/032 ISSUE 2
Published Date: 06/01/2002
Self Assessment & Self Certification of the Application of Railtrack Management Systems (aka NR/SP/ASR/032)
$18.6
NR RT/LS/P/032 ISSUE 1
Published Date: 12/01/2000
Self Assessment & Self Certification of the Application of Railtrack Safety Management Systems
$13.2

Related products

NR BRS-SM 2340 ISSUE F
Published Date: 02/19/1996
Supplementary Detection General Arrangement for UIC-54B Switches on Timber
$5.7
NR T60120 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Standard Route Indicator (F. O. 2 Indications) Acc: Relay Interface Peripheral Location Circuit
$5.7
NR T28280 ISSUE 3
Published Date: 02/04/2006
Lineside & on Track Equipment Typical Circuits Signals & Indicators Aspect Sequence; Transition from 3 to 4 aspect; Distant Signal Provided
$5.7
NR NR/L3/OPS/045/4.01 ISSUE 4
Published Date: 01/08/2023
National Operating Procedure (NOP) 4.01: Evacuation and Security Management of Signalling Locations, Controls, Stations and Trains
$13.2

Best-Selling Products

CI/Chlor 89
Published Date: 01/01/2006
Chlorine Scrubbing Systems, Third Edition
$27