NR NR/L3/ELP/27115 ISSUE 4 PDF

NR NR/L3/ELP/27115 ISSUE 4 PDF

Name:
NR NR/L3/ELP/27115 ISSUE 4 PDF

Published Date:
09/01/2018

Status:
[ Not for New Design ]

Description:

Arrangements for Isolation of the Conductor Rail for Pre-Planned Possessions of the Line - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

These instructions apply to the 750V DC Conductor rail electrified areas of the Network Rail system except for:-

- Liverpool Area DC network (Merseyrail)

- Watford DC Lines (Euston

– Watford Junction) - Northern City Line

Purpose

These instructions specify the actions and documentation required for staff undertaking isolations in connection with possessions. These instructions are additional to the requirements of the DC Electrified Lines Instructions, NR/L3/ELP/3091


Edition : 4
File Size : 2 files , 2.7 MB
Number of Pages : 19
Published : 09/01/2018

History

NR NR/L3/ELP/27115 ISSUE 5
Published Date: 06/01/2024
Planning DC Conductor Rail Isolations
$13.2
NR NR/L3/ELP/27115 ISSUE 4
Published Date: 09/01/2018
Arrangements for Isolation of the Conductor Rail for Pre-Planned Possessions of the Line - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2

Related products

NR TWI 2G020 ISSUE 3
Published Date: 04/01/2015
How to Install and Remove a Temporary AWS Magnet
$13.2
NR NR/L3/TRK/3406/03 ISSUE 2
Published Date: 03/06/2021
Design, Installation and Maintenance of Modular Bearer Joints: Inspection and Maintenance of Modular Switch and Crossing Bearer Joints
$13.2
NR NR/L3/OPS/045/2.20 ISSUE 1
Published Date: 02/06/2021
National Operating Procedure (NOP) 2.20: Station Management Training and Competence
$18.6
NR NR/CIV/SD/2229-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details Capping Slab for 9.4m Span Right Skew 45 Degrees Horizontal Deck
$5.7

Best-Selling Products