NR NR/L3/TRK/3406/03 ISSUE 2 PDF

NR NR/L3/TRK/3406/03 ISSUE 2 PDF

Name:
NR NR/L3/TRK/3406/03 ISSUE 2 PDF

Published Date:
03/06/2021

Status:
[ Active ]

Description:

Design, Installation and Maintenance of Modular Bearer Joints: Inspection and Maintenance of Modular Switch and Crossing Bearer Joints

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-trk-3406-03-issue-2_2763038

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This document applies to:

a) all staff who inspect or maintain Switches and Crossings on Network Rail infrastructure; and

b) all existing and new modular S&C installations (to the REPW standard design) on Network Rail infrastructure.

This document does not apply to all other designs, including the ‘Dog bone’ design of pin jointed bearer joint that was adopted at a limited number of sites in Wessex.

Purpose

The purpose of this document is to define the inspection and maintenance tasks that control the performance and safety risks associated with the bearer joints in modular S&C layouts, as well as defining intervention limits for modular joints.

Switch and Crossing units are maintained to the limits and requirements set out in NR/L2/TRK/001/mod05. This document builds on those requirements to provide additional detail on the inspection and maintenance to be carried out on the modular bearer joint.

Compliance with this document provides a process to mitigate risks associated with joint failures and the resulting effects on the rest of the S&C system, and to increase the service life of the modular bearer components by reducing failures.


Edition : 2
File Size : 1 file , 1 MB
Number of Pages : 19
Published : 03/06/2021

History

NR NR/L3/TRK/3406/03 ISSUE 2
Published Date: 03/06/2021
Design, Installation and Maintenance of Modular Bearer Joints: Inspection and Maintenance of Modular Switch and Crossing Bearer Joints
13.20 €
NR NR/L3/TRK/3406/03 ISSUE 1
Published Date: 09/01/2018
Design, Installation and Maintenance of Modular Bearer Joints: Inspection and Maintenance of Modular Switch and Crossing Bearer Joints
13.20 €

Related products

NR BRS-SM 101/3
Published Date: 07/23/1964
Roller for Signal Detector (Mechanical)
5.70 €
NR NR/SIN/105 ISSUE 2
Published Date: 03/25/2022
Inspection of Vossloh Type Baseplate Screws in RT60 & NR60 S&C
13.20 €
NR NR/L2/SIGELP/50000 ISSUE 5
Published Date: 12/02/2023
Safe Working and Maintenance on or near Signalling Power Distribution Equipment above 175 V AC
18.60 €
NR TWI 2G010 ISSUE 1
Published Date: 03/01/2005
How to Use a Rail Saw
5.70 €

Best-Selling Products

HIR FTV RP 2007
Published Date: 03/01/2018
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels
69.00 €
HIR FTV RP 2007
Published Date: 01/03/2023
In-service Inspection of Aboveground Atmospheric Fiberglass Reinforced Plastic Tanks and Vessels, Recommended Practice 2007(c)
79.50 €
HIR Publication 2023
Published Date: 12/31/2023
A publication providing insights into the methods used to repair small, existing, shop-fabricated steel Above-ground, Atmospheric Pressure, Vented, Tanks designed and used for Petroleum and Non- Petroleum storage
47.70 €