NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Isolation and Earthing of Autotransformer Feeder Cables Installed as Part of the -25 - 0 - +25kV Autotransformer System between Welwyn B ATFS and Hitchin SATS

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C16T

Includes: The following instructions apply only to intrusive works on along track insulated autotransformer feeder cables between traction locations installed as part of the East Coast Main Line Power Supply Upgrade (Phase 1)

Excludes: 1) Works to reconnect disconnected ATF cable sheath joint bonds

2) Works adjacent to or around the autotransformer feeder cables or routes, as described in NR/L3/ELP/22001.

3) Bare autotransfomer feeder conductors and associated sections of cabled ATF, isolated as part of the OLE system


Edition : 1
File Size : 1 file , 100 KB
Number of Pages : 4
Published : 03/02/2019

History

NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 2
Published Date: 09/05/2020
Isolation and Earthing of Autotransformer Feeder Cables Installed as Part of the -25 - 0 - +25kV Autotransformer System between Welwyn B ATFS and Hitchin SATS
$5.7
NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1
Published Date: 03/02/2019
Isolation and Earthing of Autotransformer Feeder Cables Installed as Part of the -25 - 0 - +25kV Autotransformer System between Welwyn B ATFS and Hitchin SATS
$5.7

Related products

NR NR/L1/SIG/50021 ISSUE 4
Published Date: 03/04/2023
Signalling Asset Policy
$18.6
NR NR/L3/OCS/044/MS-31 ISSUE 3
Published Date: 06/04/2011
Managed Station Manual: Control of excessive Working hours for persons undertaking safety critical work
$5.7
NR NR/SP/ELP/27205 ISSUE 2
Published Date: 04/01/2006
Installation and Operation of Buffer Sections and Permanently Earthed Sections in AC Overhead Line Equipment
$7.5
NR NR/L2/SIG/30014/D120/TS6-41 ISSUE 1
Published Date: 06/05/2021
Signalling Works Testing: Mk2 Rail Clamp Point Lock (RCPL) Wide to Gauge (WTG) Trap Points Signalling Works Test Specification
$7.5

Best-Selling Products

Handbook of Corrosion Inhibitors
Published Date: 01/01/2011
$105
Handbook of Fillers, Extenders, and Diluents
Published Date: 01/01/2008
$88.5
Handbook of Flavors and Fragrances
Published Date: 01/01/2008
$112.5
Handbook of Food Additives
Published Date: 01/01/2008
$112.5