NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1 PDF

NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Isolation and Earthing of Autotransformer Feeder Cables Installed as Part of the -25 - 0 - +25kV Autotransformer System between Welwyn B ATFS and Hitchin SATS

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-27240-nr-dist-c16t-issue-1_2772319

Choose Document Language:
5.70 €
Need Help?
NR/L3/ELP/27240/NR/DIST C16T

Includes: The following instructions apply only to intrusive works on along track insulated autotransformer feeder cables between traction locations installed as part of the East Coast Main Line Power Supply Upgrade (Phase 1)

Excludes: 1) Works to reconnect disconnected ATF cable sheath joint bonds

2) Works adjacent to or around the autotransformer feeder cables or routes, as described in NR/L3/ELP/22001.

3) Bare autotransfomer feeder conductors and associated sections of cabled ATF, isolated as part of the OLE system


Edition : 1
File Size : 1 file , 100 KB
Number of Pages : 4
Published : 03/02/2019

History

NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 2
Published Date: 09/05/2020
Isolation and Earthing of Autotransformer Feeder Cables Installed as Part of the -25 - 0 - +25kV Autotransformer System between Welwyn B ATFS and Hitchin SATS
5.70 €
NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1
Published Date: 03/02/2019
Isolation and Earthing of Autotransformer Feeder Cables Installed as Part of the -25 - 0 - +25kV Autotransformer System between Welwyn B ATFS and Hitchin SATS
5.70 €

Related products

NR NR/L1/SIG/50021 ISSUE 4
Published Date: 03/04/2023
Signalling Asset Policy
18.60 €
NR NR/L3/OCS/044/MS-31 ISSUE 3
Published Date: 06/04/2011
Managed Station Manual: Control of excessive Working hours for persons undertaking safety critical work
5.70 €
NR NR/SP/ELP/27205 ISSUE 2
Published Date: 04/01/2006
Installation and Operation of Buffer Sections and Permanently Earthed Sections in AC Overhead Line Equipment
7.50 €
NR NR/L2/SIG/30014/D120/TS6-41 ISSUE 1
Published Date: 06/05/2021
Signalling Works Testing: Mk2 Rail Clamp Point Lock (RCPL) Wide to Gauge (WTG) Trap Points Signalling Works Test Specification
7.50 €

Best-Selling Products

IEEE/ANSI 101-1987
Published Date: 12/31/1988
IEEE Guide for the Statistical Analysis of Thermal Life Test Data
67.20 €
IEEE/ANSI 18-1980
Published Date: 12/15/1980
IEEE Standard for Shunt Power Capacitors
23.40 €
IEEE/ANSI 213-1961
Published Date: 04/06/1961
ANSI/IEEE Radio Interference: Methods of Measurement of Conducted Interference Output to the Power Line from FM and Television Broadcast Receivers in the Range of 300 kHz to 25 MHz
16.50 €
IEEE/ANSI 262-1968
Published Date: 1968
USA Standard Test Code for Distribution, Power and Regulating Transformers, and Shunt Reactors
19.50 €
IEEE/ANSI 315-1975
Published Date: 12/29/1975
IEEE Standard for Graphic Symbols for Electrical and Electronics Diagrams (Including Reference Designation Letters)
39.90 €
IEEE/ANSI 315A-1986
Published Date: 09/12/1986
American National Standard - Supplement to Graphic Symbols for Electrical and Electronics Diagrams
12.90 €