Name:
NR NR/L3/ELP/27240/NR/DIST C16T ISSUE 1 PDF
Published Date:
03/02/2019
Status:
[ Revised ]
Publisher:
Network Rail
Includes: The following instructions apply only to intrusive works on along track insulated autotransformer feeder cables between traction locations installed as part of the East Coast Main Line Power Supply Upgrade (Phase 1)
Excludes: 1) Works to reconnect disconnected ATF cable sheath joint bonds
2) Works adjacent to or around the autotransformer feeder cables or routes, as described in NR/L3/ELP/22001.
3) Bare autotransfomer feeder conductors and associated sections of cabled ATF, isolated as part of the OLE system
| Edition : | 1 |
| File Size : | 1 file , 100 KB |
| Number of Pages : | 4 |
| Published : | 03/02/2019 |