NR NR/L3/ELP/29987/MOD06 ISSUE 6 PDF

NR NR/L3/ELP/29987/MOD06 ISSUE 6 PDF

Name:
NR NR/L3/ELP/29987/MOD06 ISSUE 6 PDF

Published Date:
09/04/2021

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements for the advance planning of isolations for the purpose of carrying out work in order to produce a coherent technically compliant Isolation Planning Form (IPF) for a particular week and route on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines,Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y). 

Purpose

This module provides a consistent approach to planning isolations on 25 kV a.c.electrified lines and preparing coherent technically compliant Isolation Planning Forms (IPF).

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16)


Edition : 6
File Size : 1 file , 290 KB
Number of Pages : 17
Published : 09/04/2021

History

NR NR/L3/ELP/29987/MOD06 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR NR/L3/ELP/29987/MOD06 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR NR/L3/ELP/29987/MOD06 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR NR/L3/ELP/29987/MOD06 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Planning of Isolations
$24.3

Related products

NR NR/CIV/SD/591 ISSUE B
Published Date: 09/02/2017
Tunnels Rockbolt Consumables & Testing: Standard Procedure for Performance Testing of Rockbolts Using Sept
$5.7
NR NR/L3/CIV/140/100N ISSUE 2
Published Date: 06/05/2010
Model Clause 100N: Bearings
$7.5
NR BRS-SM 2330/2&8 ISSUE B
Published Date: 04/25/1996
Supplementary Drive Mechanical Backdrive Mounted in 4 Foot on Timber for UIC 54B DVS Layout
$5.7
NR X81160 ISSUE 2
Published Date: 06/07/2003
MCB-CCTV Typical Circuits Auto Lower Circuits Strike in Circuits
$5.7

Best-Selling Products

2000 National Construction Estimator
Published Date: 01/01/2000
Basic Plumbing with Illustrations
Published Date: 06/01/1994
Excavation & Grading Handbook
Published Date: 12/01/1987
Pipe & Excavation Contracting
Published Date: 10/01/1987