NR NR/L3/ELP/29987/MOD06 ISSUE 7 PDF

NR NR/L3/ELP/29987/MOD06 ISSUE 7 PDF

Name:
NR NR/L3/ELP/29987/MOD06 ISSUE 7 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the requirements for the advance planning of isolations for the purpose of carrying out work in order to produce a coherent technically compliant Isolation Planning Form (IPF) for a particular week and route on 25 kV a.c. electrified lines.

It is applicable to Network Rail personnel and to Network Rail’s contractors. It is also applicable in relevant part to Train Operating Companies having locally controlled 25 kV a.c. overhead lines which abut those controlled by Network Rail.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to planning isolations on 25 kV a.c. electrified lines and preparing coherent technically compliant Isolation Planning Forms (IPF). 

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC) and Handbook HB16 (GE/RT8000/HB16). 


Edition : 7
File Size : 1 file , 230 KB
Number of Pages : 14
Published : 06/04/2022

History

NR NR/L3/ELP/29987/MOD06 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR NR/L3/ELP/29987/MOD06 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR NR/L3/ELP/29987/MOD06 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Planning of Isolations
$13.2
NR NR/L3/ELP/29987/MOD06 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Planning of Isolations
$24.3

Related products

NR NR/L3/OPS/045/3.33 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.33: Authorising Trains to Coast with Pantographs Lowered
$5.7
NR NB 071 ISSUE 1
Published Date: 04/01/2007
3-Wire Detection Circuit
$5.7
NR NR/SP/TRK/1110 ISSUE 2
Published Date: 06/03/2023
Qualification and Certification of Non-Destructive Testing Personnel
$18.6
NR T28433 ISSUE 1
Published Date: 04/01/2006
Lineside & on Track Equipment Typical Circuits Signals & Indicators Junction indicator; Lighting Circuits: (Dorman LED)
$5.7

Best-Selling Products

AGA A25023
Published Date: 01/01/2005
2005 Handbook of Publicly Traded AGA Member Companies
$57
AGA A25024
Published Date: 01/01/2006
2006 Handbook of Publicly Traded AGA Member Companies
$57
AGA ANSI Z223.1-2024 / NFPA 54
Published Date: 2024
National Fuel Gas Code, 2024 Edition
$28.2
AGA ANSI Z223.1 Set
Published Date: 01/01/2002
National Fuel Gas Code and Handbook Set, 2002 Edition
AGA ANSI Z223.1 Set
Published Date: 01/01/2006
National Fuel Gas Code and Handbook Set, 2006 Edition
AGA ANSI Z223.1 Set
Published Date: 2009
National Fuel Gas Code and Handbook Set, 2009 Edition
$49.5