NR NR/L3/ELP/29987/MOD10 ISSUE 5 PDF

NR NR/L3/ELP/29987/MOD10 ISSUE 5 PDF

Name:
NR NR/L3/ELP/29987/MOD10 ISSUE 5 PDF

Published Date:
12/01/2018

Status:
[ Revised ]

Description:

Working On or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module states the requirements when using voltage testing devices, portable earthing equipment and temporary continuity jumpers on 25 kV a.c. electrified lines.

The requirements for assembly, maintenance and care of voltage testing devices, portable earthing equipment and temporary continuity jumpers are stated in Network Rail standard NR/L3/ELP/27237.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

Purpose

This module provides a consistent approach to using voltage testing devices, portable earthing equipment and temporary continuity jumpers on 25 kV a.c. electrified lines.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).


Edition : 5
File Size : 1 file , 2.3 MB
Number of Pages : 48
Published : 12/01/2018

History

NR NR/L3/ELP/29987/MOD10 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$18.6

Related products

NR NR/L2/SIGELP/27501 ISSUE 1
Published Date: 12/03/2016
Specification for Temporary Insulating Covers for Network Rail Signalling Location Cases
$7.5
NR BRS-SM 318/18 ISSUE B
Published Date: 11/04/1971
Details of Throw Bar End for S.G.E Type HB M/C
$5.7
NR RT/E/S/40035 ISSUE 2
Published Date: 10/01/2000
Core Maintenance Specification for Storage & Dispensing Systems
$18.6
NR NR/L2/SIG/30009/K210 ISSUE 1
Published Date: 12/04/2021
Signalling Principles Handbook: Axle Counter System Application Principles
$18.6

Best-Selling Products

Slurry Pipeline Transportation
Published Date: 02/01/1977
$27
The Lighting of Underground Mines
Published Date: 01/01/1982
$15