NR NR/L3/ELP/29987/MOD10 ISSUE 8 PDF

NR NR/L3/ELP/29987/MOD10 ISSUE 8 PDF

Name:
NR NR/L3/ELP/29987/MOD10 ISSUE 8 PDF

Published Date:
09/03/2022

Status:
[ Active ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements when using voltage testing devices, portable earthing equipment and temporary continuity jumpers on 25 kV a.c. electrified lines.

The requirements for assembly, maintenance and care of voltage testing devices, portable earthing equipment and temporary continuity jumpers are stated in Network Rail standard NR/L3/ELP/27237.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines, Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose

This module provides a consistent approach to using voltage testing devices, portable earthing equipment and temporary continuity jumpers on 25 kV a.c. electrified lines.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).


Edition : 8
File Size : 1 file , 160 KB
Number of Pages : 8
Published : 09/03/2022

History

NR NR/L3/ELP/29987/MOD10 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$18.6

Related products

NR NR/BS/LI/152 ISSUE 1
Published Date: 11/09/2009
Letter of Instruction: Electrical Tripping - Midland Mainline Headspan Area
$7.5
NR BR 1651 PART 5
Published Date: 03/01/1991
Fibre Optic Train Operated Points Indicator
$18.6
NR NR/L2/SIG/30014/D115/DT1-04 ISSUE 2
Published Date: 12/05/2020
Signalling Works Testing Handbook: Defined Inspection Check - Check for Correct Labelling
$5.7
NR X55410
Published Date: 01/31/1995
MWL Crossing Standards Track Control & JR Circuits: Double Line Uni-Directional with Crossing Track
$5.7

Best-Selling Products

Stallcup's Electrical Design Book
Published Date: 08/01/1999