NR NR/L3/ELP/29987/MOD10 ISSUE 6 PDF

NR NR/L3/ELP/29987/MOD10 ISSUE 6 PDF

Name:
NR NR/L3/ELP/29987/MOD10 ISSUE 6 PDF

Published Date:
09/04/2021

Status:
[ Revised ]

Description:

Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module states the requirements when using voltage testing devices, portable earthing equipment and temporary continuity jumpers on 25 kV a.c. electrified lines.

The requirements for assembly, maintenance and care of voltage testing devices, portable earthing equipment and temporary continuity jumpers are stated in Network Rail standard NR/L3/ELP/27237.

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about 25 kV a.c. electrified lines,Train Operating Companies may, as best practice, apply this standard in full on infrastructure they control.

This Standard also includes:

• Work on or about 25kV electrified lines except areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure and Network Rail controlled infrastructure equipped with the 1500V d.c. overhead line system.

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation to use the Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y). 

Purpose

This module provides a consistent approach to using voltage testing devices, portable earthing equipment and temporary continuity jumpers on 25 kV a.c.electrified lines.

NOTE: Further requirements for working on or about the electrified lines are contained in the Rule Book Module AC (GE/RT8000/AC and Handbook HB16 (GE/RT8000/HB16)).

 


Edition : 6
File Size : 1 file , 170 KB
Number of Pages : 8
Published : 09/04/2021

History

NR NR/L3/ELP/29987/MOD10 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 7
Published Date: 06/04/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 6
Published Date: 09/04/2021
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5
NR NR/L3/ELP/29987/MOD10 ISSUE 5
Published Date: 12/01/2018
Working On or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$18.6

Related products

NR NR/L2/SIG/14201/MOD02 ISSUE 2
Published Date: 12/05/2020
Signalling Risk Assessment Handbook: Prevention and Mitigation of Overruns -Preliminary Assessment Specification
$13.2
NR SAO-CDR-UG-16 ISSUE 3
Published Date: 11/04/2004
IECC CD-ROM System Tester's Note
$13.2
NR NR/L3/CIV/140/170N ISSUE 2
Published Date: 06/01/2009
Model Clause 170N: General Requirements for Protective Treatments
$7.5
NR X00605 ISSUE 3
Published Date: 12/01/2008
AHBC Typical Circuits Single Line with Directional Strike-In Controls Circuit Index
$5.7

Best-Selling Products