NR RT/D/P/085 ISSUE 4 PDF

NR RT/D/P/085 ISSUE 4 PDF

Name:
NR RT/D/P/085 ISSUE 4 PDF

Published Date:
05/01/2004

Status:
[ Inactive ]

Description:

Management of Track Faults Found by Track Recording Vehicle (aka NR/SP/TRK/085)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE * PDF ONLY

This Procedure shall apply to all personnel involved with the Track Geometry Recording Service and its outputs necessary for the maintenance of Network Rail's infrastructure.

Purpose

Company Procedure RT/CE/P/038 gives the requirements for managing the Track Geometry Recording Service and the actions required to deal with the detected Track Irregularities.

This Procedure summarises only those actions to be taken to deal with defects requiring Immediate or Urgent actions and the processes which the Regional/Territory Track Engineer must put in place in order to comply with RT/CE/P/038 in those respects. It also summarises the actions to be taken by the Track Geometry Supplier in dealing with detected Track Irregularities.

It does not supplant RT/CE/P/038 in any respect.


Edition : 4
File Size : 1 file , 150 KB
Number of Pages : 10
Published : 05/01/2004

History


Related products

NR NR/L1/CIV/001 ISSUE 2
Published Date: 09/07/2024
The Management of Buildings and Civils Infrastructure
$18.6
NR RT/E/P/27159 ISSUE 1
Published Date: 12/01/2004
Installation and Maintenance of a Pneumatic Tensioning Unit in Overhead Line Equipment
$18.6
NR BRS-SM 2340 ISSUE F
Published Date: 02/19/1996
Supplementary Detection General Arrangement for UIC-54B Switches on Timber
$5.7
NR RT/E/WI/00109 ISSUE E1
Published Date: 02/01/2004
Machine Switch Out in Conjunction with the Trial of on Track Maintenance Machines (aka NR/WI/ELP/00109)
$13.2

Best-Selling Products