NR NR/L3/ELP/SAI25/01 ISSUE 1 PDF

NR NR/L3/ELP/SAI25/01 ISSUE 1 PDF

Name:
NR NR/L3/ELP/SAI25/01 ISSUE 1 PDF

Published Date:
06/03/2023

Status:
[ Revised ]

Description:

Working On or About Overhead Line Equipment (SAI): General Requirements

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module states the general requirements for working on or about Overhead Line Equipment including responsibilities, a description of the electrification systems, the danger that can arise from live overhead line equipment and how to communicate with the Electrical Control Operator (ECO).

It is applicable to Network Rail personnel and to Network Rail’s contractors.

To provide a consistent approach to working on or about Overhead Line Equipment, Train Operating Companies may, as best practice, apply this standard to infrastructure they control.

This Standard also includes:

• Work on or about any future sections of electrification on Network Rail controlled infrastructure and areas required to adopt a process for securing points of disconnection to form points of isolation a Supplementary Isolation Process (Module X).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 750V d.c. overhead line system (Sheffield Tram Train - Module Y).

• Planning of isolations, testing and earthing of overhead line equipment on Network Rail controlled infrastructure equipped with 1500V d.c. overhead line system (Sunderland Metro Systems Operating Area – Module Z).

Purpose 

This module supports a consistent understanding of working on or about Overhead Line Equipment. 

NOTE: Further requirements for working on or about the electrified lines and for communication are contained in the Rule Book Modules AC, HB16 and G1 (GE/RT8000/AC, GE/RT8000/HB16 and GE/RT8000/G1).


Edition : 1
File Size : 2 files , 580 KB
Number of Pages : 15
Published : 06/03/2023

History

NR NR/L3/ELP/SAI25/01 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): General Requirements
$13.2
NR NR/L3/ELP/SAI25/01 ISSUE 1
Published Date: 06/03/2023
Working On or About Overhead Line Equipment (SAI): General Requirements
$13.2

Related products

NR RT/SIN/085 ISSUE 1
Published Date: 10/01/2003
Western Region-Type Barrier Rear Struts
$7.5
NR X20015 ISSUE 2
Published Date: 02/05/2000
ABCL Typical Circuits General Guidelines (1)
$5.7
NR RT/E/S/40016 ISSUE 1
Published Date: 02/01/1996
Core Maintenance Specification for Fire Alarms in Depots & Stations
$13.2
NR RT/E/P/27158 ISSUE 1
Published Date: 12/01/2004
Installation of Brown Boveri 25kV Section Insulators
$18.6

Best-Selling Products

CMAA 70-04
Published Date: 01/01/2004
Specifications for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2010
Published Date: 2010
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2020
Published Date: 2020
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
$31.5
CMAA 74-2004
Published Date:
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2010
Published Date: 2010
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2020
Published Date: 2020
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
$31.5