NR NR/L3/OCS/043/3.1 ISSUE 5 PDF

NR NR/L3/OCS/043/3.1 ISSUE 5 PDF

Name:
NR NR/L3/OCS/043/3.1 ISSUE 5 PDF

Published Date:
06/04/2011

Status:
[ Withdrawn ]

Description:

National Control Instructions: Failure of Signalling Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
W/D * PDF ONLY

PURPOSE

Controllers shall:

• respond to faults and failures as they are reported;

• work with maintenance to deliver a timely response by maintenance;

• determine the full details and effects of the failure and;

• maintain the safety of the operational railway;

• correctly identify the type of failure as detailed in NR/L2/SIG/10047 Management Of Safety Related Reports For Signalling Failures and enter the details into FMS or the appropriate system.


Edition : 5
File Size : 1 file , 15 KB
Number of Pages : 1
Published : 06/04/2011

History


Related products

NR SSI8505A ISSUE 6
Published Date: 09/05/2015
SSI Data Procedures - Chapter A: Table of Contents
$7.5
NR TEF 3043 ISSUE 3
Published Date: 09/01/2013
Level Crossing Rail Corrosion Inspection
$5.7
NR NR/SIN/209 ISSUE 1
Published Date: 06/13/2022
Regulatory Requirements for PCB Contaminated Equipment
$18.6
NR NR/L3/SCO/311/06 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Safety Performance Monitoring
$13.2

Best-Selling Products

IFI 100/107
Published Date: 04/01/2002
PREVAILING TORQUE-TYPE STEEL HEX AND HEX FLANGE NUTS REGULAR AND LIGHT HEX SERIES
$4.5
IFI 101 (R2013)
Published Date: 07/01/2002
TORQUE-TENSION REQUIREMENTS FOR PREVAILING-TORQUE TYPE STEEL HEX AND HEX FLANGE NUTS
$12
IFI 108
Published Date: 01/06/2008
GRADE AND SOURCE IDENTIFICATION MARKING OF GRADES B AND C PREVAILING-TORQUE TYPE HEX LOCKNUTS
$12
IFI 110 (R2013)
Published Date: 02/07/2003
GLOSSARY OF TERMS RELATING TO BLIND RIVETS
$12