Name:
NR NR/L3/OCS/043/3.1 ISSUE 5 PDF
Published Date:
06/04/2011
Status:
[ Withdrawn ]
Publisher:
Network Rail
PURPOSE
Controllers shall:
• respond to faults and failures as they are reported;
• work with maintenance to deliver a timely response by maintenance;
• determine the full details and effects of the failure and;
• maintain the safety of the operational railway;
• correctly identify the type of failure as detailed in NR/L2/SIG/10047 Management Of Safety Related Reports For Signalling Failures and enter the details into FMS or the appropriate system.
| Edition : | 5 |
| File Size : | 1 file , 15 KB |
| Number of Pages : | 1 |
| Published : | 06/04/2011 |