Name:
NR NR/L3/OCS/043/3.3 ISSUE 2 PDF
Published Date:
09/03/2011
Status:
[ Withdrawn ]
Publisher:
Network Rail
PURPOSE
In all matters Controllers shall:
• respond to Track Circuit failures and Track Defects as they are reported;
• ensure a timely response by maintenance teams;
• determine the full details and effects of the failure;
• be aware of the operation of the New Measurement Train (NMT);
• maintain the safety of the operational railway.
| Edition : | 2 |
| File Size : | 1 file , 41 KB |
| Number of Pages : | 8 |
| Published : | 09/03/2011 |