Name:
NR NR/L3/OPS/043/4.3 ISSUE 4 PDF
Published Date:
03/05/2016
Status:
[ Withdrawn ]
Publisher:
Network Rail
This National Control Instruction provides the approach to be applied when changes to the train plan are necessary at short notice and additional track access (VSTP) is required.
Application of the process is undertaken by controllers within Network Rail Route Controls and representatives within Freight and Train Operating Companies.
PURPOSE
The purpose of this National Control Instruction is to make certain that all relevant information and restrictions have been considered before additional track access is granted to a bid from an operator outside train planning timescales. Without this being completed and valid schedules for the services being produced:
a) a train will not have a consist which causes operating difficulties and may have safety of the line implications e.g. if it sets off a Hot Axle Box Detector or carries dangerous goods;
b) the signaller will not know how to route the train which is especially relevant for traffic with route or operating restrictions;
c) the Train Operator will not be charged for track access, as the billing system is driven off data from TRUST.
| Edition : | 4 |
| File Size : | 1 file , 110 KB |
| Number of Pages : | 9 |
| Published : | 03/05/2016 |