NR RT/E/WI/27132 ISSUE 1 PDF

NR RT/E/WI/27132 ISSUE 1 PDF

Name:
NR RT/E/WI/27132 ISSUE 1 PDF

Published Date:
12/04/2004

Status:
[ Inactive ]

Description:

Substation Plant, Remote Control and Protection Equipment Defect Reporting

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
INACTIVE * PDF ONLY

Introduction

This instruction details the procedure to be adopted for written reporting of defects found on substation plant, remote control and protection equipment using the standard defect report from TPS/P/155/1.

Reports shall be used to analyse equipment behaviour trends and to help determine future maintenance and equipment renewal policy.


Edition : 1
File Size : 1 file , 190 KB
Number of Pages : 18
Published : 12/04/2004

History


Related products

NR NR/L3/OPS/045/2.02 ISSUE 4
Published Date: 01/06/2024
National Operating Procedure (NOP) 2.02: Controller Competence Assessment and Development
$24.3
NR NR/L2/ADG/003 ISSUE 1
Published Date: 12/03/2016
Asset Data Exchange Plan
$13.2
NR RT/CE/P/023 ISSUE 3
Published Date: 02/01/1999
Incident Management Of Bridge Strikes
$13.2
NR T60118 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Standard Route Indicator (F. O. 1 Indication) Acc: Relay Interface Peripheral Location Circuit
$5.7

Best-Selling Products