Name:
NR NR/L3/OPS/045/2.06 ISSUE 2 PDF
Published Date:
06/02/2018
Status:
[ Revised ]
Publisher:
Network Rail
The requirements of this procedure apply to any individual operating signalling equipment and those involved in the management of these individuals. This includes those for whom signalling is a core duty and those for whom it is not (i.e. non-signallers and those acting in the capacity of contingent signallers).
This procedure should be read in conjunction with:
NR/L3/OPS/045/2.01 which outlines the requirements for assessor competence and the verification process,
NR/L3/OPS/045/2.17 which outlines the process for local training and is an important step in acquiring competence to operate signalling equipment.
Level 2 Infrastructure Operator Apprenticeship Programme Guide.
PURPOSE
This procedure sets out the arrangements to be followed in order to train, assess, develop and confirm the competence of those required to operate signalling equipment.
In particular it sets out the arrangements to be followed by signallers new to the business from May 2017 to attain a Level 2 Infrastructure Operator Apprenticeship.
| Edition : | 2 |
| File Size : | 1 file , 900 KB |
| Number of Pages : | 36 |
| Published : | 06/02/2018 |