NR NR/L3/OPS/045/2.06 ISSUE 5 PDF

NR NR/L3/OPS/045/2.06 ISSUE 5 PDF

Name:
NR NR/L3/OPS/045/2.06 ISSUE 5 PDF

Published Date:
01/06/2024

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 2.06: Signaller Competence Assessment and Development

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

The requirements of this procedure apply to any individual operating signalling equipment for whom signalling is a core duty. It also applies to those involved in the management of these individuals.

This procedure should be read in conjunction with:

a) NR/L3/OPS/045/2.01 – Quality Assurance in Occupational Competence

b) NR/L3/OPS/045/2.12 – Operational Development Days and Safety Briefings;

c) NR/L3/OPS/045/2.14 – Additional Monitoring of Employees and Support Procedure;

d) NR/L3/OPS/045/2.15 – Visits to Employees at Operational Locations

e) NR/L3/OPS/045/2.16 – Monitoring the Quality of Spoken Communications; and

f) NR/L3/OPS/045/2.17 – Signalling Location Training Plans

PURPOSE 

This procedure sets out the arrangements to be followed to assess the competence of and develop expertise in those who operate signalling equipment, such as signallers.


Edition : 5
File Size : 1 file , 420 KB
Number of Pages : 26
Published : 01/06/2024

History

NR NR/L3/OPS/045/2.06 ISSUE 5
Published Date: 01/06/2024
National Operating Procedure (NOP) 2.06: Signaller Competence Assessment and Development
$18.6
NR NR/L3/OPS/045/2.06 ISSUE 4
Published Date: 11/06/2021
National Operating Procedure (NOP) 2.06: Competence Standard and Assessment Framework for Operating Signalling Equipment
$18.6
NR NR/L3/OPS/045/2.06 ISSUE 3
Published Date: 09/05/2020
National Operating Procedure (NOP) 2.06: Competence Standard and Assessment Framework for Operating Signalling Equipment - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L3/OPS/045/2.06 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 2.06: Competence Standard and Assessment Framework for Operating Signalling Equipment
$18.6

Related products

NR BRS-SM 855
Published Date: 06/10/1986
Apparatus Case Large Roof Assembly
$5.7
NR NR/L3/OCS/044/FS-19A ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Fire System Statement
$5.7
NR X70020 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits (Non CCTV) Control & Indication Circuits
$5.7
NR NR/L3/OCS/043/4.5 ISSUE 1
Published Date: 03/01/2008
National Control Instructions: Altered Train Calling Points
$5.7

Best-Selling Products