Name:
NR NR/L3/OPS/045/2.06 ISSUE 4 PDF
Published Date:
11/06/2021
Status:
[ Revised ]
Publisher:
Network Rail
The requirements of this procedure apply to any individual operating signalling equipment for whom signalling is a core duty, it also applies to those involved in the management of these individuals.
This procedure should be read in conjunction with:
a) NR/L3/OPS/045/2.01 which outlines the requirements for assessor competence and the verification process;
b) NR/L3/OPS/045/2.12 – Operational Development Day;
c) NR/L3/OPS/045/2.14 – Additional Monitoring of Employees;
d) NR/L3/OPS/045/2.15 – Visits to Employees in Operational Locations;
e) NR/L3/OPS/045/2.16 – Monitoring the Quality of Spoken Communications; and
f) NR/L3/OPS/045/2.17 - Signalling Location Tarining Plans
PURPOSE
This procedure details the competency framework and associated processes to train, assess, develop and continually confirm the competence of those required to operate signalling framework.
| Edition : | 4 |
| File Size : | 1 file , 490 KB |
| Number of Pages : | 32 |
| Published : | 11/06/2021 |