Name:
NR NR/L3/OPS/045/2.18 ISSUE 2 PDF
Published Date:
09/01/2018
Status:
[ Active ]
Publisher:
Network Rail
This document applies to all Network Rail managed lever frame signalling locations, ground frames and shunter releases (see GK/RT0077) and includes when testing manual signal lever weights and following reports of heavy lever pulls.
PURPOSE
This document provides Network Rail with a consistent and risk-based approach for minimising the risk of injury to operational staff when operating manual levers. This assessment is carried out as part of a location planned general inspection by the appropriate manager and the local health and safety representatives and / or when a heavy pull has been reported by the user. This document mitigates the risk of accidents and health issues for staff employed at sites that have heavy pull levers.
| Edition : | 2 |
| File Size : | 1 file , 940 KB |
| Number of Pages : | 19 |
| Published : | 09/01/2018 |