NR NR/L3/OPS/045/2.19 ISSUE 2 PDF

NR NR/L3/OPS/045/2.19 ISSUE 2 PDF

Name:
NR NR/L3/OPS/045/2.19 ISSUE 2 PDF

Published Date:
06/03/2023

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 2.19: Station Training and Competence Framework

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

The requirements of this procedure apply to any Network Rail employee working in a Network Rail station environment in a front-line capacity, for example as a customer service assistant, station control assistant, station reception or station supervisor. Throughout this document the term Station Staff is used to cover all these roles.

This procedure applies to all common or exclusively controlled areas of Network Rail Managed Stations except stations where the Train Operators lead as the Service Provider to Network Rail Infrastructure Limited. 

PURPOSE 

This procedure sets out the arrangements to be followed in order to assess, develop and confirm the competence of those Network Rail employees working in a station environment in a front-line capacity at Network Rail Managed Stations.


Edition : 2
File Size : 1 file , 550 KB
Number of Pages : 37
Published : 06/03/2023

History

NR NR/L3/OPS/045/2.19 ISSUE 2
Published Date: 06/03/2023
National Operating Procedure (NOP) 2.19: Station Training and Competence Framework
$18.6
NR NR/L3/OPS/045/2.19 ISSUE 1
Published Date: 06/02/2018
National Operating Procedure (NOP) 2.19: Customer Service Assistance Competence Assessment Process
$18.6

Related products

NR NR/L3/SIG/11303/2K05 ISSUE 2
Published Date: 09/04/2010
Signalling Installation - Batteries: Primary Cells
$7.5
NR X70181 ISSUE 3
Published Date: 04/02/2005
MCB Typical Circuits Audible Warning Volume Limiter (1)
$5.7
NR NR/L3/TRK/1020 ISSUE 1
Published Date: 12/03/2022
Track Hand Back for Projects: Confirming Track Is Safe for Opening at the Selected Line Speed After Projects Engineering Work
$18.6
NR BRS-SC 22 ISSUE B
Published Date: 06/09/1975
Cable Trough - Concrete Trough for Transition Unit
$5.7

Best-Selling Products