NR NR/L3/OPS/045/3.12 ISSUE 1 PDF

NR NR/L3/OPS/045/3.12 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.12 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Not for New Design ]

Description:

National Operating Procedure (NOP) 3.12: Wrong Routing Incidents - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This procedure applies to Network Rail Route Operations Control employees when dealing with a wrong routing incident.

PURPOSE

This procedure allows a safe and adequate response to be provided when a train has had a route incorrectly set and has the potential to cause a safety or performance impact.


Edition : 1
File Size : 2 files , 310 KB
Number of Pages : 3
Published : 09/02/2017

History

NR NR/L3/OPS/045/3.12 ISSUE 2
Published Date: 07/06/2024
National Operating Procedure (NOP) 3.12: Wrong Routing Incidents
$5.7
NR NR/L3/OPS/045/3.12 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.12: Wrong Routing Incidents - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$5.7

Related products

NR NR/L3/SIG/11303/2S10 ISSUE 2
Published Date: 09/04/2010
Signalling Installation - Points: Electric Point Machines
$13.2
NR NR/L3/OHS/005/01 ISSUE 2
Published Date: 06/04/2022
Design and Construction in a High Street Environment: High Street Project Standards Catalogue - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/CSG/STP001/05 ISSUE 2
Published Date: 03/05/2022
Standards and Controls Management: Producing Bowties and Using them to Support the Management of Standards and Control Documents
$18.6
NR RT/E/WI/27094 ISSUE 1
Published Date: 12/04/2004
Instruction for the Attachment of Spanwire to Tube Clamps
$13.2

Best-Selling Products

SN-CLC/TS 45545-5:2009
Published Date: 01/28/2009
Railway applications — Fire protection on railway vehicles — Part 5: Fire safety requirements for electrical equipment including that of trolley buses, track guided buses and magnetic levitation vehicles