National Operating Procedure (NOP) 3.31: Permissive Working - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This procedure covers all non-passenger permissive signaled moves and all permissive platform signalled moves including:

•  Goods Lines /Loops;

•  Reception /Arrival Lines (Network Rail Infrastructure);

•  contingency arrangements;

•  attaching and detaching to / from passenger trains (including where one portionis Empty Coaching Stock (ECS);

•  platform sharing(PP-S);

•  terminal stations;

•  Permissive Platform (PP);

•  Permissive Platform Contingency purposes (PP-C); and

•  Permissive Platform Attaching / Detaching movements (PP-A). This procedure doesnot cover:

•  attaching /detaching to / from ECS trains (shunting with the authority of aground position signal);

•  locomotives either changing ends or being changed;and

•  assistance to failed trains.

NOTE: Forguidance on permissive workingsee RIS-0744-CCS .

PURPOSE

Thisprocedure sets out the requirements for signalling two trains when the secondis signalledonto a running line which is already occupied.

The procedure:

a)controls the risk so far as reasonably practicable of train collisions when signalled in accordance with the permissive working arrangements;

b)allows permissive working to be conducted in a safe manner and with an assessment of all the factors that might affect a driver’s ability to perform this

manoeuvre satisfactorily; and

c)allows for the decision to be made as to whether to continue with the current permissive working arrangements to continue or alternatively as to whether permissive working at that location is no longer required.

During significant service disruption permissive platform workings allow:

a)increased line capacity;

NOTE: e.g. by attaching two trains together.

b)passengers to make alternative travel arrangements;

c)passengers to use the station’s facilities;

d)clearance of heavily delayed trains to be expedited; and

e)reduce the risk of passengers self -evacuating.

 


Edition : 2
File Size : 1 file , 410 KB
Number of Pages : 8
Published : 09/04/2021

History

NR NR/L3/OPS/045/3.31 ISSUE 3
Published Date: 07/01/2023
National Operating Procedure (NOP) 3.31: Permissive Working
$7.5
NR NR/L3/OPS/045/3.31 ISSUE 2
Published Date: 09/04/2021
National Operating Procedure (NOP) 3.31: Permissive Working - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L3/OPS/045/3.31 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.31: Permissive Platform Working
$7.5

Related products

NR NR/L2/MTC/PL0131 ISSUE 2
Published Date: 08/26/2008
Engineering Haulage Train Planning
$13.2
NR BRS-SM 350/S2 ISSUE A
Published Date: 12/04/1970
Facing Point Layouts Power Worked Layout of Drive Connections for Long Switches
$5.7
NR BRS-SM 611/1 ISSUE D
Published Date: 08/19/1986
Post Mounted Signs Support Arm Angled for Lamp Unit
$5.7
NR TWI 2C009 ISSUE 1
Published Date: 03/01/2005
How to Fit an Insulator
$5.7

Best-Selling Products