Name:
NR NR/L3/OPS/045/3.31 ISSUE 1 PDF
Published Date:
09/02/2017
Status:
[ Revised ]
Publisher:
Network Rail
This procedure covers all permissive platform signalled moves including:
contingency arrangements;
attaching and detaching to / from passenger trains (including where one portion is Empty Coaching Stock (ECS));
platform sharing;
terminal stations;
Permissive Platform (PP);
Permissive Platform Contingency purposes (PP-C);
Permissive Platform Attaching / Detaching movements (PP-A);
During significant service disruption permissive platform working would allow:
increased line capacity, e.g. by attaching two trains together;
passengers to make alternative travel arrangements;
passengers to use the station’s facilities;
clearance of heavily delayed trains to be expedited;
Reduce the risk of passengers self-evacuating.
This procedure does not cover:
permissive non passenger train movements;
attaching / detaching to / from ECS trains (shunting with the authority of a ground position signal);
locomotives either changing ends or being changed; assistance to failed trains.
PURPOSE
This procedure defines the requirements for signalling two trains when the second is signalled onto a running line which is already occupied.
The procedure:
a) controls the risk so far as reasonably practicable of train collisions when signalled in accordance with the permissive working arrangements; and
b) allows permissive working to be conducted in a safe manner and with an assessment of all the factors that might affect a driver’s ability to perform this manoeuvre satisfactorily.
| Edition : | 1 |
| File Size : | 1 file , 210 KB |
| Number of Pages : | 7 |
| Published : | 09/02/2017 |