NR NR/L3/OPS/045/3.31 ISSUE 1 PDF

NR NR/L3/OPS/045/3.31 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/3.31 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Revised ]

Description:

National Operating Procedure (NOP) 3.31: Permissive Platform Working

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This procedure covers all permissive platform signalled moves including:

  • contingency arrangements;

  • attaching and detaching to / from passenger trains (including where one portion is Empty Coaching Stock (ECS));

  • platform sharing;

  • terminal stations;

  • Permissive Platform (PP);

  • Permissive Platform Contingency purposes (PP-C);

  • Permissive Platform Attaching / Detaching movements (PP-A);

During significant service disruption permissive platform working would allow:

  • increased line capacity, e.g. by attaching two trains together;

  • passengers to make alternative travel arrangements;

  • passengers to use the station’s facilities;

  • clearance of heavily delayed trains to be expedited;

  • Reduce the risk of passengers self-evacuating.

This procedure does not cover:

  • permissive non passenger train movements;

  • attaching / detaching to / from ECS trains (shunting with the authority of a ground position signal);

  • locomotives either changing ends or being changed; assistance to failed trains.

PURPOSE

This procedure defines the requirements for signalling two trains when the second is signalled onto a running line which is already occupied.

The procedure:

a) controls the risk so far as reasonably practicable of train collisions when signalled in accordance with the permissive working arrangements; and

b) allows permissive working to be conducted in a safe manner and with an assessment of all the factors that might affect a driver’s ability to perform this manoeuvre satisfactorily.


Edition : 1
File Size : 1 file , 210 KB
Number of Pages : 7
Published : 09/02/2017

History

NR NR/L3/OPS/045/3.31 ISSUE 3
Published Date: 07/01/2023
National Operating Procedure (NOP) 3.31: Permissive Working
$7.5
NR NR/L3/OPS/045/3.31 ISSUE 2
Published Date: 09/04/2021
National Operating Procedure (NOP) 3.31: Permissive Working - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5
NR NR/L3/OPS/045/3.31 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 3.31: Permissive Platform Working
$7.5

Related products

NR NR/L3/SCO/313/SP-1.12 ISSUE 4
Published Date: 06/01/2024
On-Track Machines (OTMs) Driver and Operations Standards Manual: OTM Driver Licence Certificate
$13.2
NR NR/OP/110 ISSUE 24
Published Date: 03/01/2024
Network Rail Adopted RISs
$5.7
NR NR/L2/SIG/11201/MODA11 ISSUE 4
Published Date: 06/04/2011
Signalling Design Handbook: Operating Requirements Review
$7.5
NR NB 057 ISSUE 1
Published Date: 07/01/2006
Storage of Dorman LED Colour Light Signals
$5.7

Best-Selling Products

IEC/TR 60034-16-2 Ed. 1.0 b:1991
Published Date: 02/15/1991
Rotating electrical machines - Part 16: Excitation systems for synchronous machines - Chapter 2: Models for power system studies
$88.746
IEC/TR 60068-3-12 Ed. 2.0 b:2014
Published Date: 10/17/2014
Environmental testing - Part 3-12: Supporting documentation and guidance - Method to evaluate a possible lead-free solder reflow temperature profile
$39.9
IEC/TR 60068-3-12 Ed. 3.0 en:2022
Published Date: 10/01/2022
Environmental testing - Part 3-12: Supporting documentation and guidance - Method to evaluate a possible lead-free solder reflow temperature profile
$83.4
IEC/TR 60068-3-15 Ed. 1.0 en:2024
Published Date: 02/01/2024
Environmental testing – Part 3-15: Supporting documentation and guidance – Vacuum-assisted reflow soldering
$70.2
IEC/TR 60068-3-82 Ed. 1.0 en:2024
Published Date: 08/01/2024
Environmental testing – Part 3-82: Supporting documentation and guidance – Confirmation of the performance of whisker test method
$115.8
IEC/TR 60071-4 Ed. 1.0 en:2004
Published Date: 06/23/2004
Insulation co-ordination - Part 4: Computational guide to insulation co-ordination and modelling of electrical networks
$136.5