NR NR/L3/OPS/045/5.03 ISSUE 1 PDF

NR NR/L3/OPS/045/5.03 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/5.03 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Active ]

Description:

National Operating Procedure (NOP) 5.03: Management of Station Vehicles and Other Plant

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This procedure is related to all common or exclusively controlled areas of Network Rail Managed Stations except:

• St Pancras (Midland Road) Station, where this is covered by the St Pancras International Station arrangements.

• Stations where the Train Operators lead with the development of the plans as the Service Provider to Network Rail Infrastructure Limited. Any alternative arrangements will be documented via Safety Validation or approved Statement of Arrangements.

This procedure applies to all vehicles used in all Network Rail Managed Stations premises. This does not include non-resident contractors where NR/L3/OPS/045/5.04 should be applied. The following items are included but are not classed as vehicles: trailers, non-powered tanking bowsers, un-braked or braked cages and catering modules.

PURPOSE

To put in place a system to manage the maintenance, specification, operator training, pre user inspections and safe system of work for all vehicles and operator propelled plant with all Network Rail Managed Stations.


Edition : 1
File Size : 1 file , 420 KB
Number of Pages : 11
Published : 09/02/2017

History


Related products

NR NR/L3/ELP/27240/NR/DIST C03D ISSUE 6
Published Date: 06/03/2023
Maintenance of VCB Switchgear
$13.2
NR NR/L3/NDS/048/TMM001 ISSUE 9
Published Date: 06/01/2010
Train Operations Manual - Industry Mandatory Section: Machine/Crane Controller Competence
$18.6
NR NR/L2/ELP/CTM015/010 ISSUE 2
Published Date: 06/01/2019
Competence & Training in DC Conductor Rail Engineering: DCCR 10: Contribute to Minimising Risk When Working On or Near Live DC Conductor Rail or Electrical Power Supply Equipment
$7.5
NR NR/PRC/MPI/PP02 ISSUE 1
Published Date: 10/20/2006
Workbank Planning
$18.6

Best-Selling Products

An Album of Fluid Motion
Published Date: 05/01/1982