NR NR/L3/OPS/045/5.06 ISSUE 1 PDF

NR NR/L3/OPS/045/5.06 ISSUE 1 PDF

Name:
NR NR/L3/OPS/045/5.06 ISSUE 1 PDF

Published Date:
09/02/2017

Status:
[ Revised ]

Description:

National Operating Procedure (NOP) 5.06: Management of the Operational Railway Interface

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-ops-045-5-06-issue-1_2764161

Choose Document Language:
5.70 €
Need Help?
PDF ONLY

This procedure applies to Network Rail Managed Stations except:

  • St Pancras (Midland Road) Station, where this is covered by the St Pancras International Station arrangements.

  • Stations where the Train Operators lead with the development of the plans as the Service Provider to Network Rail Infrastructure Limited. Any alternative arrangements will be documented via Safety Validation or approved Statement of Arrangements.

  • Birmingham New Street where the train dispatch activity is carried out by Network Rail and there is no requirement to monitor a third party.

  • The dispatch of trains from all platforms, by any party at a managed station including the associated platform train interface.

  • Dispatch of trains from all platforms by any party at a managed station and the platform train interface.

PURPOSE

This procedure:

a) maintains safety on platforms by providing assurance that train operators are compliant with their documented processes and controls for the dispatch of trains;

b) sets out responsibilities for the Platform Train Interface.


Edition : 1
File Size : 1 file , 170 KB
Number of Pages : 4
Published : 09/02/2017

History

NR NR/L3/OPS/045/5.06 ISSUE 2
Published Date: 03/05/2022
National Operating Procedure (NOP) 5.06: Management of the Platform Training Interface Risk
7.50 €
NR NR/L3/OPS/045/5.06 ISSUE 1
Published Date: 09/02/2017
National Operating Procedure (NOP) 5.06: Management of the Operational Railway Interface
5.70 €

Related products

NR BRS-SM 3011 ISSUE 1
Published Date: 02/07/2007
Hy-Drive Point Layout NR60 Layouts Details & Sections
5.70 €
NR NB 071 ISSUE 1
Published Date: 04/01/2007
3-Wire Detection Circuit
5.70 €
NR NR/L3/INV/0104 ISSUE 2
Published Date: 09/05/2009
Reporting of Occupational Ill-Health
7.50 €
NR SAO-IEC-HP-14 ISSUE 6
Published Date: 05/23/2001
Integrated Electronic Control Centre Project Handbook IECC 8004 Handover, Support & Maintenance
13.20 €

Best-Selling Products

TPI 1
Published Date: 01/01/2022
National Design Standard for Metal Plate Connected Wood Truss Construction
39.60 €
TPI ANSI/TPI-1
Published Date: 01/01/2005
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 03/18/2016
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
37.20 €
TPI ANSI/TPI-1
Published Date: 02/29/1996
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 07/15/2011
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION
TPI ANSI/TPI-1
Published Date: 07/18/2003
NATIONAL DESIGN STANDARD FOR METAL PLATE CONNECTED WOOD TRUSS CONSTRUCTION