NR NR/L3/SCO/311/08 ISSUE 2 PDF

NR NR/L3/SCO/311/08 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/08 ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details the procedure by which SCO vehicles are removed from and released to traffic in accordance with the maintenance plan or when defects are identified. The application of the requirements and procedures contained within this module mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets

Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 240 KB
Number of Pages : 10
Published : 03/02/2019

History

NR NR/L3/SCO/311/08 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
$13.2
NR NR/L3/SCO/311/08 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
$7.5
NR NR/L3/SCO/311/08 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Removal and Release of Trains to Traffic
$7.5

Related products

NR NR/L3/TRK/0027 ISSUE 3
Published Date: 03/06/2021
Excavation and Ballast as Built (aka NR/L3/INI/TK0027)
$13.2
NR NR/L3/TRK/1015 ISSUE 8
Published Date: 03/04/2023
Management of Basic Visual Inspection
$7.5
NR T28315 ISSUE 1
Published Date: 09/11/1997
Lineside & On Track Equipment Typical Circuits Signals & Indicators Colour Light; Lighting Circuit; 3 Aspect; Y/YY/G
$5.7
NR NR/L3/ELP/29987/MOD10 ISSUE 8
Published Date: 09/03/2022
Working on or About 25 kV A.C. Electrified Lines: Use of Voltage Testing Devices, Portable Earthing Equipment and Temporary Continuity Jumpers
$7.5

Best-Selling Products