NR NR/L3/SCO/311/16 ISSUE 2 PDF

NR NR/L3/SCO/311/16 ISSUE 2 PDF

Name:
NR NR/L3/SCO/311/16 ISSUE 2 PDF

Published Date:
03/02/2019

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Handling and Storage of Safety Related Components

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module details requirements for the handling, storage and transportation of safety related components at and between maintenance and storage locations, to prevent damage and degradation.

Specific instruction is provided within this module for stored and delivered wheelsets to manage the risks of damage and defects arising during storage, handling and shipping prior to fitment in accordance with GM/RT2466 and RIS-2704-RST.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 2
File Size : 1 file , 330 KB
Number of Pages : 16
Published : 03/02/2019

History

NR NR/L3/SCO/311/16 ISSUE 3
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Management of Safety Related Components
$18.6
NR NR/L3/SCO/311/16 ISSUE 2
Published Date: 03/02/2019
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Handling and Storage of Safety Related Components
$13.2

Related products

NR RT/E/WI/27110 ISSUE 1
Published Date: 12/04/2004
Isolation & Earthing for Isolating Transformers, Associated Cables & Equipment at West London Junction, Mitre Bridge Junction & Scrubs Lane (aka NR/WI/ELP/27110)
$18.6
NR NR/L3/OPS/021/09 ISSUE 2
Published Date: 12/03/2022
Weather Management Index: Management of Structures During Adverse and Extreme Weather
$7.5
NR T25200 ISSUE 6
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points Standard and In-Bearer Clamp Lock Applications (1)
$5.7
NR NR/L1/XNG/100/02 ISSUE 3
Published Date: 09/04/2021
Level Crossing Asset Policy: Level Crossing Technology Strategy
$13.2

Best-Selling Products

IGEM UP/2
Published Date: 06/01/2014
Installation pipework on industrial and commercial premises