NR NR/L3/SCO/311/19 ISSUE 1 PDF

NR NR/L3/SCO/311/19 ISSUE 1 PDF

Name:
NR NR/L3/SCO/311/19 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Revised ]

Description:

Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Operational Requirements for SCO Fleet

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This module is applicable to the Supply Chain Operations managed fleet where Network Rail is identified as the Entity in Charge of Maintenance (ECM) on the National Vehicle Register (NVR).

This module is applicable to all SCO teams responsible for the engineering and management of SCO T&RS and OTM assets.

SCO owned assets which have a third party ECM identified in the NVR are not in scope of this manual.

On-Track Plant (OTP), Mobile Depot Plant (MDP) and Fixed Depot Plant (FDP) are not in scope of this manual.

Purpose

This module provides requirements and procedures to enable Supply Chain Operations (SCO) to comply with ROGS, with the requirements of NR/L1/RMVP/0001 and NR/L2/RMVP/0090 (where specified) and enables the implementation of an ISO 55001 compliant Asset Management System (AMS) within SCO.

This module provides requirements for the technical input into the operation of SCO fleets and defines operational requirements to establish an ISO55001 AMS within SCO for T&RS and OTM assets.

The application of the requirements and procedures contained within this manual mitigate the following high level risks:

a) Non-compliance with legislation and regulatory requirements.

b) Maintenance safety risks posed to staff undertaking maintenance on Network Rail On Track Machines (OTM) and Traction and Rolling Stock (T&RS) assets.

c) Operational safety risks posed by Network Rail OTM and T&RS assets when operated on Network Rail managed infrastructure.


Edition : 1
File Size : 1 file , 210 KB
Number of Pages : 7
Published : 06/02/2018

History

NR NR/L3/SCO/311/19 ISSUE 2
Published Date: 03/05/2022
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Driving and Operational Requirements
$7.5
NR NR/L3/SCO/311/19 ISSUE 1
Published Date: 06/02/2018
Supply Chain Operations, T&RS and OTM Engineering and Management Manual: Operational Requirements for SCO Fleet
$7.5

Related products

NR NR/L3/MTC/RCS0216/OLE05 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Taking Heights & Staggers with OLE Live
$5.7
NR NR/L3/OCS/044/GN-03 ISSUE 1
Published Date: 06/04/2011
Managed Station Manual: Work Safe Procedure
$5.7
NR NR/CIV/SD/1250 ISSUE E
Published Date: 12/01/2018
Z-Type Underbridges: Steelwork Protective Treatment: Notes
$5.7
NR BRS-SE 181/2 ISSUE C
Published Date: 02/12/1993
Flashing Warning Road Lights Backboard, High Visibility for Lamp & Backboard Assembly
$5.7

Best-Selling Products

ANSI/IEST/ISO 14644-12
Published Date: 08/01/2018
Cleanrooms and associated controlled environments - Part 12: Specifications for monitoring air cleanliness by nanoscale particle concentration
$23.4
ANSI/IEST/ISO 14644-16
Published Date: 05/01/2019
Cleanrooms and associated controlled environments - Part 16: Code of practice for improving energy efficiency in cleanrooms and clean air devices
$65.7
ANSI/IEST/ISO 14644-18: 2023
Published Date: 10/20/2023
Cleanrooms and Associated Controlled Environments - Part 18: Assessment of Suitability of Consumables
$65.7
ANSI/IEST/ISO 14644-4
Published Date: 11/01/2022
Cleanrooms and associated controlled environments - Part 4: Design, construction and start-up
$73.5