NR NR/L3/SIG/10665 ISSUE 18 PDF

NR NR/L3/SIG/10665 ISSUE 18 PDF

Name:
NR NR/L3/SIG/10665 ISSUE 18 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Reliability Centred Maintenance of Signalling Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document covers the conditions required to allow the transition from the default maintenance regime to a Reliability-Centred Maintenance regime for signalling equipment.

This document applies to:

 a) Section Managers (Signals);

 b) Signal & Telecoms Maintenance Engineers;

 c) Route Asset Managers (Signals).

Purpose

This document contains the prerequisites, allowing Reliability-Centred Maintenance to be implemented on signalling equipment as an alternative to the default maintenance regime.


Edition : 18
File Size : 1 file , 870 KB
Number of Pages : 44
Published : 03/07/2020

History

NR NR/L3/SIG/10665 ISSUE 23
Published Date: 06/03/2023
Reliability Centred Maintenance of Signalling Equipment
$24.3
NR NR/L3/SIG/10665 ISSUE 22
Published Date: 06/04/2022
Reliability Centred Maintenance of Signalling Equipment
$24.3
NR NR/L3/SIG/10665 ISSUE 21
Published Date: 12/04/2021
Reliability Centred Maintenance of Signalling Equipment
$18.6
NR NR/L3/SIG/10665 ISSUE 20
Published Date: 09/04/2021
Reliability Centred Maintenance of Signalling Equipment
$18.6
NR NR/L3/SIG/10665 ISSUE 19
Published Date: 12/05/2020
Reliability Centred Maintenance of Signalling Equipment
$18.6
NR NR/L3/SIG/10665 ISSUE 18
Published Date: 03/07/2020
Reliability Centred Maintenance of Signalling Equipment
$18.6

Related products

NR NR/L2/TRK/3201 ISSUE 3
Published Date: 12/04/2010
Management of Tight Clearances & Track Position
$18.6
NR NR/GN/ELP/27247 ISSUE 1
Published Date: 12/01/2005
Guidance for Electrical Installations on Rail Premises (including Plugs, Sockets, Trailing Leads & Appliances)
$13.2
NR NR/L3/OPS/045/3.27 ISSUE 2
Published Date: 04/03/2021
National Operating Procedure (NOP) 3.27: Briefing of Immediately Transferable Lessons from Serious Operational Incidents
$5.7
NR BRS-SM 322 ISSUE F
Published Date: 05/15/1991
Point Layouts FB & BH Track Arrangement of Point Fittings & Switch Rail Drillings at Toes of Switches
$5.7

Best-Selling Products