Name:
NR NR/L3/SIG/10665 ISSUE 18 PDF
Published Date:
03/07/2020
Status:
[ Revised ]
Publisher:
Network Rail
This document covers the conditions required to allow the transition from the default maintenance regime to a Reliability-Centred Maintenance regime for signalling equipment.
This document applies to:
a) Section Managers (Signals);
b) Signal & Telecoms Maintenance Engineers;
c) Route Asset Managers (Signals).
Purpose
This document contains the prerequisites, allowing Reliability-Centred Maintenance to be implemented on signalling equipment as an alternative to the default maintenance regime.
| Edition : | 18 |
| File Size : | 1 file , 870 KB |
| Number of Pages : | 44 |
| Published : | 03/07/2020 |