Name:
NR NR/L3/SIG/10665 ISSUE 19 PDF
Published Date:
12/05/2020
Status:
[ Revised ]
Publisher:
Network Rail
This document covers the conditions required to allow the transition from the default maintenance regime to a Reliability-Centred Maintenance regime for signaling equipment.
This document applies to:
a) Section Managers (Signals);
b) Signal & Telecoms Maintenance Engineers;
c) Route Asset Managers (Signals).
Purpose
This document contains the prerequisites, allowing Reliability-Centred Maintenance to be implemented on signalling equipment as an alternative to the default maintenance regime.
| Edition : | 19 |
| File Size : | 1 file , 580 KB |
| Number of Pages : | 46 |
| Published : | 12/05/2020 |